Power plant · Gedling, England, United Kingdom

Gedling Colliery AD

Gedling Colliery AD is a cancelled power plant in Gedling, England, United Kingdom, with 3 MW of capacity, operated by Biogen.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationGedling (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand At Gedling Colliery Arnold Lane Gedling, NG4 4HFDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (abandoned)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date2 Oct 2014 (permit 2014/1025NCC, Town and Country Planning Act, issued by Gedling)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date22 Aug 2014 (reference 2014/1025NCC, planning authority Gedling)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date15 Mar 2015 (withdrawn, reference 2014/1025NCC, planning authority Gedling)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date2 Oct 2014 (granted, reference 2014/1025NCC, planning authority Gedling)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorBiogen (Biogen (formerly Tamar Energy))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity3 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyAnaerobic DigestionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.9899, -1.0856DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Withdrawn (planning authority Gedling, reference 2014/1025NCC)
  2. Permit granted (planning authority Gedling, reference 2014/1025NCC)
  3. Permit applied for (planning authority Gedling, reference 2014/1025NCC)

How it compares

Gedling Colliery AD is the 2,525th-largest of 3,430 power plants in England and the 3,739th-largest of 5,050 in the United Kingdom by capacity; its 3 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,525th of 3,43071,965 MW<0.1%
United Kingdom3,739th of 5,050115,622 MW<0.1%
All power plants in our data9,677th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 31 substations, 30 grid connections (12 operating, 165 MW), 5 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
nLighten NottinghamData center——8.8 km
ExperianData center——13 km
Digital Space DC - NewarkData center——22 km
Weston Marsh to East LeicestershireTransmission line—Planned23 km
Chesterfield to WillingtonTransmission line—Planned24 km
Hall Water Treatment Works grid connectionGrid connection1.6 MWOperating37 km
Newton on Trent Water Works grid connectionGrid connection3.1 MWOperating38 km
Wind 20.22 MW grid connection at Pennyhill WindfarmGrid connection20.2 MWOperating38 km
Kiveton ParkSubstation——40 km

Operator and place

More from Biogen

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page