Power plant · Torridge, England, United Kingdom

Gammaton Moor Solar farm

Gammaton Moor Solar farm is a power plant in Torridge, England, United Kingdom, with 32 MW of capacity, operated by Sonnedix.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationTorridge (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressWebbery Barton & Cleave Farm, EX39 4QZDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2026DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date19 Apr 2022 (permit 1/1057/2021/FULM, Town and Country Planning Act, issued by Torridge)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date1 Sept 2021 (reference 1/1057/2021/FULM, planning authority Torridge)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date19 Apr 2022 (granted, reference 1/1057/2021/FULM, planning authority Torridge)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSonnedixDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity32 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area63.3 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.0067, -4.1388DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Torridge, reference 1/1057/2021/FULM)
  3. Permit applied for (planning authority Torridge, reference 1/1057/2021/FULM)

How it compares

Gammaton Moor Solar farm is the 371st-largest of 3,430 power plants in England and the 701st-largest of 5,050 in the United Kingdom by capacity; its 32 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England371st of 3,43071,965 MW<0.1%
United Kingdom701st of 5,050115,622 MW<0.1%
All power plants in our data2,696th of 12,0321,190,447 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 1 data center, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Data center, England (OSM way 164113041)Data center——32 km

Operator and place

More from Sonnedix

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page