Power plant · South Ribble, England, United Kingdom

Farington Waste Recovery Park (Waste AD)

Farington Waste Recovery Park (Waste AD) is a power plant in South Ribble, England, United Kingdom, with 1.9 MW of capacity, operated by Global Renewables Lancashire.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSouth Ribble (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2010DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date22 Nov 2006 (permit 07/06/0821, Town and Country Planning Act, issued by South Ribble)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date17 Jul 2006 (reference 07/06/0821, planning authority South Ribble)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date22 Nov 2006 (granted, reference 07/06/0821, planning authority South Ribble)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGlobal Renewables LancashireDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyAnaerobic DigestionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.7039, -2.7345DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority South Ribble, reference 07/06/0821)
  3. Permit applied for (planning authority South Ribble, reference 07/06/0821)

How it compares

Farington Waste Recovery Park (Waste AD) is the 2,935th-largest of 3,430 power plants in England and the 4,367th-largest of 5,050 in the United Kingdom by capacity; its 1.9 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,935th of 3,43071,965 MW<0.1%
United Kingdom4,367th of 5,050115,622 MW<0.1%
All power plants in our data10,706th of 12,0321,190,447 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 372 grid connections (202 operating, 1,728 MW), 334 substations, 16 data centers, 2 transmission lines and 1 gas storage facility, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Moss Side (Leyland)Substation——0.8 km
Glowhouse Power grid connectionGrid connection5.06 MWPlanned1.1 km
Seven StarsSubstation——2.0 km
Moss Lane grid connectionGrid connection2 MWOperating2.1 km
Lancs Enterprises Business Park grid connectionGrid connection7.62 MWOperating2.6 km
Leyland BSPSubstation——2.7 km
East Irish Sea Transmission ProjectTransmission line—Planned20 km
Morgan and Morecambe Offshore Wind Farms Transmission AssetsTransmission line—Permitted22 km
Data center, England (OSM way 1551100328)Data center——26 km

Operator and place

More from Global Renewables Lancashire

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page