Power plant · Warrington, England, United Kingdom

Fairchild Road, Burtonwood & Westbrook - Solar Panels

Fairchild Road, Burtonwood & Westbrook - Solar Panels is a cancelled solar power plant in Warrington, England, United Kingdom, with 1 MW of capacity, operated by Mountpark Logistics.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWarrington (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressUnit 3, Fairchild Road, Burtonwood & Westbrook, Warrington, WA5 3TZDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission granted, permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date23 Oct 2023 (permit 2023/00837/FUL, Town and Country Planning Act, issued by Warrington)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date10 Jul 2023 (reference 2023/00837/FUL, planning authority Warrington)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date23 Oct 2023 (granted, reference 2023/00837/FUL, planning authority Warrington)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorMountpark Logistics (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area0.48 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.4128, -2.6480DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Warrington, reference 2023/00837/FUL)
  2. Permit applied for (planning authority Warrington, reference 2023/00837/FUL)

How it compares

Fairchild Road, Burtonwood & Westbrook - Solar Panels is the 3,882nd-largest of 4,035 power plants in England and the 5,619th-largest of 5,834 in the United Kingdom by capacity; its 1 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England3,882nd of 4,035134,434 MW<0.1%
United Kingdom5,619th of 5,834200,500 MW<0.1%
All power plants in our data15,551st of 15,8001,923,633 MW<0.1%

Nearby

Within 50 km of this power plant: 334 grid connections (184 operating, 1,629 MW), 326 substations, 17 data centers, 3 gas storage facilities and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Iron MountainData center——1.2 km
Verizon WarringtonData center——3.2 km
Bold GSPSubstation——3.8 km
Unit 1 Junction Lane grid connectionGrid connection5.26 MWPlanned4.0 km
Parkside Railway Station grid connectionGrid connection3 MWOperating4.9 km
Newton Le WillowsSubstation——5.3 km
Lymes Wood Landfill Site grid connectionGrid connection1.03 MWOperating5.8 km
HaydockSubstation——6.6 km
Data center, England (OSM way 1551100328)Data center——6.9 km

Operator and place

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page