Power plant · Blaby, England, United Kingdom
Enderby Storage, Redcomb Farm
Enderby Storage, Redcomb Farm is a battery storage plant in Blaby, England, United Kingdom, with 49.9 MW of capacity, operated by Gresham House and Statera Energy.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Blaby (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Land Opposite Redcomb Farm, Desford Road, Lubbesthorpe, Leicester, Leicestershire, LE19 4AD | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2022 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 4 Jan 2018 (permit 17/1223/FUL, Town and Country Planning Act, issued by Blaby) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 13 Oct 2017 (reference 17/1223/FUL, planning authority Blaby) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 4 Jan 2018 (granted, reference 17/1223/FUL, planning authority Blaby) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Gresham House (Statera Energy / Gresham House) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Statera Energy (Statera Energy / Gresham House) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 49.9 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 52.5981, -1.2202 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Commissioned
- Permit granted (planning authority Blaby, reference 17/1223/FUL)
- Permit applied for (planning authority Blaby, reference 17/1223/FUL)
How it compares
Enderby Storage, Redcomb Farm is the 305th-largest of 4,035 power plants in England and the 538th-largest of 5,834 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 305th of 4,035 | 134,434 MW | <0.1% |
| United Kingdom | 538th of 5,834 | 200,500 MW | <0.1% |
| All power plants in our data | 3,762nd of 15,799 | 1,918,113 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Started operating
Nearby
Within 50 km of this power plant: 7 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Santander data center, England | Data center | — | — | 1.8 km |
| Santander data center, England | Data center | — | — | 2.2 km |
| Data center, England (OSM way 710050084) | Data center | — | — | 13 km |
| Weston Marsh to East Leicestershire | Transmission line | — | Planned | 28 km |
Operators and place
More from Gresham House
- Cockenzie Battery Storage System - Site A240 MW · permitted
- Cockenzie Battery Storage System - Site B102 MW · permitted
- Harburnhead Wind Farm51.7 MW
- Glassenbury - Battery Storage System50 MW · permitted
- West Didsbury Battery Storage50 MW
- Low Farm Solar Farm49.9 MW · under construction
- Pleasance Road - Battery Energy Facility49.9 MW
- Siddington Solar Farm19.9 MW · under construction
Other power plants in England
- Drax Power Station Biomass Units2,580 MW
- Ratcliffe-on-Soar2,021 MW
- Cottam2,000 MW
- Walpole Flexible Generation Project2,000 MW
- West Burton2,000 MW
- Eggborough1,960 MW
- Staythorpe1,828 MW
- Fiddler’s Ferry1,510 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DUKES 5.11: Power stations in the United Kingdom, Open Government Licence v3.0.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- JRC Open Power Plants Database (JRC-PPDB-OPEN), European Commission, Joint Research Centre. JRC Open Power Plants Database (JRC-PPDB-OPEN), CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Dutch power station owners' and operators' pages. Dutch power station owners' and operators' pages, Facts only, each linked to its page.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- Wikidata. Wikidata, CC0 1.0.