Power plant · Hinckley and Bosworth, England, United Kingdom

Desford Brick Works, Bagworth - Solar Panels

Desford Brick Works, Bagworth - Solar Panels is a power plant in Hinckley and Bosworth, England, United Kingdom, with 2.6 MW of capacity, operated by Leicestershire County Council.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationHinckley and Bosworth (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressForterra Building Products Ltd Desford Brick Works Heath Road Bagworth Coalville, LE67 1DLDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2024DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date14 Jul 2022 (permit 22/00516/C, Town and Country Planning Act, issued by Hinckley and Bosworth)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date27 May 2022 (reference 22/00516/C, planning authority Hinckley and Bosworth)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date14 Jul 2022 (granted, reference 22/00516/C, planning authority Hinckley and Bosworth)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorLeicestershire County CouncilDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity2.6 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.6562, -1.3146DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Desford Brick Works, Bagworth - Solar Panels is the 2,644th-largest of 3,430 power plants in England and the 3,901st-largest of 5,050 in the United Kingdom by capacity; its 2.6 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,644th of 3,43071,985 MW<0.1%
United Kingdom3,901st of 5,050115,642 MW<0.1%
All power plants in our data9,931st of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Town and Country Planning Act), no. 22/00516/C
  2. Started operating

Nearby

Within 50 km of this power plant: 385 grid connections, 8 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Solar 18 MW grid connection at Coalville 33Kv S StnGrid connection——1.5 km
Lindridge Farm Solar Park grid connectionGrid connection——1.5 km
OFF Bagworth RD, Barlestone grid connectionGrid connection——2.0 km
Santander data center, EnglandData center——11 km
Santander data center, EnglandData center——11 km
Data center, England (OSM way 710050084)Data center——14 km
Weston Marsh to East LeicestershireTransmission line—Planned29 km
Chesterfield to WillingtonTransmission line—Planned43 km