Power plant · Amber Valley, England, United Kingdom

Derby Road - Solar Panels

Derby Road - Solar Panels is a planned power plant in Amber Valley, England, United Kingdom, with 38 MW of capacity, operated by Starlight Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationAmber Valley (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressE/O Derby Road, Ripley, DE5 3BTDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date20 Mar 2025 (reference AVA/2024/0877, planning authority Amber Valley)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorStarlight EnergyDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity38 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.0512, -1.4053DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Amber Valley, reference AVA/2024/0877)

How it compares

Derby Road - Solar Panels is the 919th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,453rd-largest of 3,222 in the United Kingdom by capacity; its 38 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England919th of 2,174185,888 MW<0.1%
United Kingdom1,453rd of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data2,689th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 76 substations, 66 grid connections (30 operating, 325 MW), 6 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Chesterfield to WillingtonTransmission line—Planned3.2 km
nLighten NottinghamData center——14 km
ExperianData center——26 km
DronfieldSubstation——28 km
GreenhillSubstation——31 km
Baslow RoadSubstation——31 km
Wind 20.22 MW grid connection at Pennyhill WindfarmGrid connection20.2 MWOperating31 km
Battery storage and Solar 35 MW grid connection at Bochum Parkway Combined TechGrid connection35 MWPlanned31 km
Battery storage and Solar 40 MW grid connection at Mansion House Farm BESSGrid connection40 MWPlanned32 km

Operator and place

More from Starlight Energy

Other power plants in England

All 5809 power plants in England, United Kingdom