Power plant · Tameside, England, United Kingdom

Denton Hall Farm Road, Denton - Solar Photovoltaic System

Denton Hall Farm Road, Denton - Solar Photovoltaic System is a power plant in Tameside, England, United Kingdom, with 1.16 MW of capacity, operated by System 3 Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationTameside (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressSystem 3 Limited Denton Hall Farm Road Denton, Manchester, M34 2SYDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date13 Jul 2023 (permit 21/01436/FUL, Town and Country Planning Act, issued by Tameside)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date11 Jan 2022 (reference 21/01436/FUL, planning authority Tameside)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date13 Jul 2023 (granted, reference 21/01436/FUL, planning authority Tameside)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSystem 3 LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.16 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area0.76 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.4500, -2.1306DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Tameside, reference 21/01436/FUL)
  2. Permit applied for (planning authority Tameside, reference 21/01436/FUL)

How it compares

Denton Hall Farm Road, Denton - Solar Photovoltaic System is the 3,265th-largest of 3,430 power plants in England and the 4,826th-largest of 5,050 in the United Kingdom by capacity; its 1.16 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England3,265th of 3,43071,965 MW<0.1%
United Kingdom4,826th of 5,050115,622 MW<0.1%
All power plants in our data11,641st of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 476 substations, 400 grid connections (218 operating, 2,041 MW), 21 data centers and 3 gas storage facilities, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
System 3 Ltd grid connectionGrid connection1.46 MWPlanned0.1 km
Denton WestSubstation——1.2 km
Denton EastSubstation——1.5 km
Reddish ValeSubstation——1.8 km
Isabella Power grid connectionGrid connection5 MWOperating2.7 km
Vernon Park BESS grid connectionGrid connection75 MWPlanned2.8 km
Data center, England (OSM way 703959498)Data center——3.7 km
CDL Strata Campus Data CentreData center——5.6 km
Equinix MA1Data center——7.2 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page