Power plant · North Northamptonshire, England, United Kingdom

Corby Biomass Plant

Corby Biomass Plant is a cancelled power plant in North Northamptonshire, England, United Kingdom, with 14.3 MW of capacity, operated by Aztec Energy and EPR Corby.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth Northamptonshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressCorby Biomass Plant, Phoenix Parkway, CorbyDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (abandoned)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date1 Apr 2001 (permit 00/00143DPA, Town and Country Planning Act, issued by North Northamptonshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date11 May 2000 (reference 00/00143DPA, planning authority North Northamptonshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date1 Apr 2001 (granted, reference 00/00143DPA, planning authority North Northamptonshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorAztec Energy (EPR Corby / Aztec Energy)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEPR Corby (EPR Corby / Aztec Energy)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity14.3 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBiomass (dedicated)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.5092, -0.6751DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority North Northamptonshire, reference 00/00143DPA)
  2. Permit applied for (planning authority North Northamptonshire, reference 00/00143DPA)

How it compares

Corby Biomass Plant is the 831st-largest of 3,430 power plants in England and the 1,481st-largest of 5,050 in the United Kingdom by capacity; its 14.3 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England831st of 3,43071,965 MW<0.1%
United Kingdom1,481st of 5,050115,622 MW<0.1%
All power plants in our data5,429th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 6 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.

NameKindSizeStatusDistance
The Horizon CentreData center——2.1 km
Data center, England (OSM way 87850427)Data center——28 km
Hellermann Tyton DataData center——35 km
Weston Marsh to East LeicestershireTransmission line—Planned37 km

Operators and place

Other power plants in England

All 5809 power plants in England, United Kingdom