Power plant · Peterborough, England, United Kingdom

Coningsby Business Park, Stirling Way - Solar Panels

Coningsby Business Park, Stirling Way - Solar Panels is a permitted solar power plant in Peterborough, England, United Kingdom, with 1.3 MW of capacity, operated by Industrials Propco 1 Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationPeterborough (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressConingsby Business Park Stirling Way Bretton, PE3 8SBDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date30 Apr 2024 (permit 24/00229/PRIOR, Town and Country Planning Act, issued by Peterborough)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date11 Mar 2024 (reference 24/00229/PRIOR, planning authority Peterborough)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date30 Apr 2024 (granted, reference 24/00229/PRIOR, planning authority Peterborough)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorIndustrials Propco 1 Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.3 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.6085, -0.2798DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Peterborough, reference 24/00229/PRIOR)
  2. Permit applied for (planning authority Peterborough, reference 24/00229/PRIOR)

How it compares

Coningsby Business Park, Stirling Way - Solar Panels is the 1,511th-largest of 1,650 power plants planned, permitted or under construction in England and the 2,373rd-largest of 2,548 in the United Kingdom by capacity; its 1.3 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,511th of 1,650171,264 MW<0.1%
United Kingdom2,373rd of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data5,616th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 4 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Data center, England (OSM way 87850427)Data center——5.9 km
Positive ParkData center——23 km
The Horizon CentreData center——27 km
Triton Knoll Electrical SystemTransmission line—Permitted36 km
Eastern Green Link 3 and Eastern Green Link 4Transmission line—Planned42 km
Kings Lynn B Connection ProjectTransmission line—Permitted46 km

Operator and place

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page