Power plant · Torridge, England, United Kingdom

Coldharbour Farm, Ashreigney - Solar Photovoltaic Array

Coldharbour Farm, Ashreigney - Solar Photovoltaic Array is a cancelled solar power plant in Torridge, England, United Kingdom, with 50 MW of capacity, operated by Coldharbour Solar Park Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationTorridge (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressColdharbour Farm Ashreigney Chulmleigh, EX18 7NQDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission granted, permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date19 Sept 2023 (permit 1/0823/2021/FULM, Town and Country Planning Act, issued by Torridge)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date14 Jul 2021 (reference 1/0823/2021/FULM, planning authority Torridge)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date19 Sept 2023 (granted, reference 1/0823/2021/FULM, planning authority Torridge)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorColdharbour Solar Park Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity50 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area59.6 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.8974, -3.9816DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Torridge, reference 1/0823/2021/FULM)
  2. Permit applied for (planning authority Torridge, reference 1/0823/2021/FULM)

How it compares

Coldharbour Farm, Ashreigney - Solar Photovoltaic Array is the 290th-largest of 4,035 power plants in England and the 519th-largest of 5,834 in the United Kingdom by capacity; its 50 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England290th of 4,035134,434 MW<0.1%
United Kingdom519th of 5,834200,500 MW<0.1%
All power plants in our data3,744th of 15,8001,923,633 MW<0.1%

Nearby

Within 50 km of this power plant: 1 data center, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Data center, England (OSM way 164113041)Data center——40 km

Operator and place

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page