Power plant · Mid Suffolk, England, United Kingdom

Climax Molybdenum UK Limited, Needham Road - Solar PV Panels

Climax Molybdenum UK Limited, Needham Road - Solar PV Panels is a permitted solar power plant in Mid Suffolk, England, United Kingdom, with 1.2 MW of capacity, operated by Climax Molybdenum UK Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationMid Suffolk (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressClimax Molybdenum UK Ltd Needham Road, IP14 2AEDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date1 May 2024 (permit DC/23/04966, Town and Country Planning Act, issued by Mid Suffolk)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date1 Nov 2023 (reference DC/23/04966, planning authority Mid Suffolk)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date1 May 2024 (granted, reference DC/23/04966, planning authority Mid Suffolk)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorClimax Molybdenum UK Ltd (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.2 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area1.8 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.1819, 1.0166DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Mid Suffolk, reference DC/23/04966)
  2. Permit applied for (planning authority Mid Suffolk, reference DC/23/04966)

How it compares

Climax Molybdenum UK Limited, Needham Road - Solar PV Panels is the 1,532nd-largest of 1,650 power plants planned, permitted or under construction in England and the 2,398th-largest of 2,548 in the United Kingdom by capacity; its 1.2 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,532nd of 1,650171,264 MW<0.1%
United Kingdom2,398th of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data5,647th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 3 transmission lines and 1 data center, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Bramford to TwinsteadTransmission line—Permitted22 km
LionLink InterconnectorTransmission line—Planned35 km
US Air Force data center, BrandonData center——40 km
Norwich to TilburyTransmission line—Planned47 km

Operator and place

Other power plants in England

All 5872 power plants in England, United Kingdom