Power plant · East Staffordshire, England, United Kingdom

Claymills Sewage Treatment Works, Meadow Lane - Solar Panels

Claymills Sewage Treatment Works, Meadow Lane - Solar Panels is a planned power plant in East Staffordshire, England, United Kingdom, with 25 MW of capacity, operated by Wetmore Solar Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEast Staffordshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressSouth of Claymills Sewage Treatment Works Meadow Lane, DE14 1DHDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date13 May 2026 (reference P/2026/00480, planning authority East Staffordshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorWetmore Solar LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity25 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area33 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.8223, -1.6177DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority East Staffordshire, reference P/2026/00480)

How it compares

Claymills Sewage Treatment Works, Meadow Lane - Solar Panels is the 1,108th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,741st-largest of 3,222 in the United Kingdom by capacity; its 25 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,108th of 2,174185,888 MW<0.1%
United Kingdom1,741st of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data3,376th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 8 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 5, up to 3 per kind.

NameKindSizeStatusDistance
Chesterfield to WillingtonTransmission line—Planned26 km
ExperianData center——32 km
nLighten NottinghamData center——34 km
Data center, England (OSM way 710050084)Data center——35 km
Weston Marsh to East LeicestershireTransmission line—Planned45 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page