Power plant · Tewkesbury, England, United Kingdom
Claydon Farm - Solar Farm & Battery Storage
Claydon Farm - Solar Farm & Battery Storage is a permitted battery storage plant in Tewkesbury, England, United Kingdom, with 49.9 MW of capacity, operated by JBM Solar Projects 17 Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Tewkesbury (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Land At Claydon Farm Claydon Tewkesbury, GL20 7BH | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 17 Dec 2021 (permit 21/00259/FUL, Town and Country Planning Act, issued by Tewkesbury) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 21 Jan 2021 (reference 21/00259/FUL, planning authority Tewkesbury) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 17 Dec 2021 (granted, reference 21/00259/FUL, planning authority Tewkesbury) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | JBM Solar Projects 17 Limited (applicant) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 49.9 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (co-located with re) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.9822, -2.0971 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority Tewkesbury, reference 21/00259/FUL)
- Permit applied for (planning authority Tewkesbury, reference 21/00259/FUL)
How it compares
Claydon Farm - Solar Farm & Battery Storage is the 454th-largest of 1,650 power plants planned, permitted or under construction in England and the 800th-largest of 2,548 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 454th of 1,650 | 171,264 MW | <0.1% |
| United Kingdom | 800th of 2,548 | 279,068 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,897th of 5,799 | 657,076 MW | <0.1% |
Nearby
Within 50 km of this power plant: 54 grid connections (30 operating, 466 MW), 32 substations and 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Shipton Oliffe Primary | Substation | — | — | 16 km |
| Northleach Primary | Substation | — | — | 24 km |
| Ionos data center, England | Data center | — | — | 25 km |
| Rissington Primary | Substation | — | — | 28 km |
| DXC Technology | Data center | — | — | 29 km |
| Bathurst Estates grid connection | Grid connection | 49.9 MW | Operating | 31 km |
| Cirencester Solar Park grid connection | Grid connection | 25 MW | Planned | 31 km |
| Crucis Park Estate LLP grid connection | Grid connection | 12.6 MW | Planned | 31 km |
| Evoque Data Center Solutions | Data center | — | — | 39 km |
Operator and place
More from JBM Solar Projects 17 Limited
- Claydon Farm - Solar Farm & Battery Storage49.9 MW · permitted
Other power plants in England
- Drax Power Station Biomass Units2,580 MW
- Ratcliffe-on-Soar2,021 MW
- Cottam2,000 MW
- Walpole Flexible Generation Project2,000 MW
- West Burton2,000 MW
- Eggborough1,960 MW
- Staythorpe1,828 MW
- Fiddler’s Ferry1,510 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.
- Wikidata. Wikidata, CC0 1.0.