Cearn Solar Farm is a planned solar power plant in Vale of White Horse, England, United Kingdom, with 100 MW of capacity, operated by Cearn Solar Farm Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationVale of White Horse (coordinates), England (South East)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
AddressCearn Solar Farm is located within Vale of the White Horse District, Oxfordshire. It comprises three main development areas, situated to the south of Garford, east of Charney Basset, north of West Hanney, south of Goosey and north-east of Baulking.Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (pre-application)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Application date1 Sept 2027 (reference EN0110044, planning authority The Planning Inspectorate, anticipated, expected September 2027)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorCearn Solar Farm Limited (applicant)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity100 MW (description)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBatteryPlanning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsPlanning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Area1,708 ha (application boundary)planning.data.gov.uk · record · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.6586, -1.3880Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Cearn Solar Farm is the 234th-largest of 1,650 power plants planned, permitted or under construction in England and the 401st-largest of 2,548 in the United Kingdom by capacity; its 100 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England234th of 1,650171,264 MW<0.1%
United Kingdom401st of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data1,267th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 210 grid connections (106 operating, 1,348 MW), 180 substations and 22 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Manor Farm Solar Project grid connectionGrid connection13.4 MWOperating0.6 km
40MW Solar PV grid connectionGrid connection40 MWPlanned1.0 km
ADJ Milletts Farm grid connectionGrid connection60 MWPlanned1.6 km
Fyfield PrimarySubstation——3.8 km
Drayton BSPSubstation——5.2 km
Grove PrimarySubstation——6.8 km
AWS Didcot Data CentreData center——9.9 km
R89Data center——11 km
University Shared Data CentreData center——15 km