Power plant · Broadland, England, United Kingdom

Burgate Solar Farm

Burgate Solar Farm is a permitted power plant in Broadland, England, United Kingdom, with 15 MW of capacity, operated by Pathfinder Clean Energy UK Dev Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBroadland (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressBurgate Solar Farm, NR10 3BXDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date13 Aug 2021 (permit 20202016, Town and Country Planning Act, issued by Broadland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date28 Oct 2020 (reference 20202016, planning authority Broadland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date13 Aug 2021 (granted, reference 20202016, planning authority Broadland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorPathfinder Clean Energy UK Dev LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity15 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area29.1 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.7079, 1.3090DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Broadland, reference 20202016)
  2. Permit applied for (planning authority Broadland, reference 20202016)

How it compares

Burgate Solar Farm is the 1,344th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,094th-largest of 3,222 in the United Kingdom by capacity; its 15 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,344th of 2,174185,888 MW<0.1%
United Kingdom2,094th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data4,421st of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 1 transmission line, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Norwich to TilburyTransmission line—Planned15 km

Operator and place

More from Pathfinder Clean Energy UK Dev Limited

Other power plants in England

All 5809 power plants in England, United Kingdom