Power plant · East Lindsey, England, United Kingdom
Bluestone Heath Road
Bluestone Heath Road is a cancelled power plant in East Lindsey, England, United Kingdom, with 1.5 MW of capacity, operated by Marriages Specialist Foods.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | East Lindsey (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Marriages Specialist Foods, Bluestone Heath Road, Driby Top, Alford, Lincolnshire, LN13 0BT | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Cancelled (planning permission expired) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 31 Mar 2015 (permit N/163/00245/15, Town and Country Planning Act, issued by East Lindsey) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 19 Feb 2015 (reference N/163/00245/15, planning authority East Lindsey) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 31 Mar 2015 (granted, reference N/163/00245/15, planning authority East Lindsey) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Marriages Specialist Foods | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 1.5 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 3.84 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.2525, 0.1045 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Bluestone Heath Road is the 3,048th-largest of 3,430 power plants in England and the 4,531st-largest of 5,050 in the United Kingdom by capacity; its 1.5 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 3,048th of 3,430 | 71,985 MW | <0.1% |
| United Kingdom | 4,531st of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 11,060th of 12,008 | 1,173,302 MW | <0.1% |
Nearby
Within 50 km of this power plant: 152 grid connections (39 operating, 575 MW), 30 substations and 4 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Grimsby to Walpole | Transmission line | — | Planned | 4.8 km |
| Solar 5 MW grid connection at South Reston | Grid connection | 5 MW | Operating | 7.3 km |
| South Reston | Substation | — | — | 7.9 km |
| Mablethorpe Water Treatment Works Mile End Lane LN12 2QW grid connection | Grid connection | — | — | 11 km |
| Bambers Farm, Mile End Lane grid connection | Grid connection | — | — | 12 km |
| Ossian Transmission Infrastructure | Transmission line | — | Cancelled | 14 km |
| Keddington Road | Substation | — | — | 15 km |
| Louth | Substation | — | — | 16 km |
| Eastern Green Link 3 and Eastern Green Link 4 | Transmission line | — | Planned | 34 km |
Operator and place
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.