Power plant · North Tyneside, England, United Kingdom

Benton Lane, Quorum Business Park - Solar Panels

Benton Lane, Quorum Business Park - Solar Panels is a planned power plant in North Tyneside, England, United Kingdom, with 8 MW of capacity, operated by Shelborn Asset Management.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth Tyneside (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressThe South East Of Roundabout At Salters Lane And Benton Lane West Moor, NE12 8BTDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date31 Mar 2026 (reference 25/01018/FULM, planning authority North Tyneside)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorShelborn Asset ManagementDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity8 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area12.8 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates55.0229, -1.5809DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority North Tyneside, reference 25/01018/FULM)

How it compares

Benton Lane, Quorum Business Park - Solar Panels is the 1,529th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,371st-largest of 3,222 in the United Kingdom by capacity; its 8 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,529th of 2,174185,888 MW<0.1%
United Kingdom2,371st of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data5,473rd of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 222 grid connections (108 operating, 1,264 MW), 134 substations and 2 data centers, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
KillingworthSubstation——1.2 km
LongbentonSubstation——1.9 km
Gas 5.463 MW grid connection at LongbentonGrid connection5.46 MWOperating2.1 km
GosforthSubstation——2.1 km
Solar 28.12 MW grid connection at BackworthGrid connection28.1 MWPlanned3.5 km
Gas 5.7 MW grid connection at KillingworthGrid connection5.7 MWOperating4.6 km
Stellium Newcastle CampusData center——4.9 km
DXC Wynyard Data CenterData center——47 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page