Power plant · Tewkesbury, England, United Kingdom
Bengrove Farm, Base Lane - Solar Farm
Bengrove Farm, Base Lane - Solar Farm is a permitted power plant in Tewkesbury, England, United Kingdom, with 15 MW of capacity, operated by Sonnedix Bengrove Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Tewkesbury (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Bengrove Farm Base Lane Sandhurst, GL2 9NU | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 21 Oct 2024 (permit 24/00050/FUL, Town and Country Planning Act, issued by Tewkesbury) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 22 Jan 2024 (reference 24/00050/FUL, planning authority Tewkesbury) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 21 Oct 2024 (granted, reference 24/00050/FUL, planning authority Tewkesbury) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Sonnedix Bengrove Limited | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 15 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 25.1 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.9036, -2.2447 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority Tewkesbury, reference 24/00050/FUL)
- Permit applied for (planning authority Tewkesbury, reference 24/00050/FUL)
How it compares
Bengrove Farm, Base Lane - Solar Farm is the 1,344th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,094th-largest of 3,222 in the United Kingdom by capacity; its 15 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,344th of 2,174 | 185,888 MW | <0.1% |
| United Kingdom | 2,094th of 3,222 | 300,461 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 4,421st of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 64 grid connections (40 operating, 583 MW), 40 substations, 6 data centers and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| DXC Technology | Data center | — | — | 17 km |
| Shipton Oliffe Primary | Substation | — | — | 21 km |
| Whiteway Primary | Substation | — | — | 27 km |
| Bathurst Estates grid connection | Grid connection | 49.9 MW | Operating | 28 km |
| Cirencester Solar Park grid connection | Grid connection | 25 MW | Planned | 28 km |
| Northleach Primary | Substation | — | — | 29 km |
| Crucis Park Estate LLP grid connection | Grid connection | 12.6 MW | Planned | 30 km |
| Ionos data center, England | Data center | — | — | 34 km |
| Nationwide Swindon Technology Centre | Data center | — | — | 46 km |
Operator and place
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.