Power plant · North Warwickshire, England, United Kingdom

BAC Jaguar Land Rover Battery Assembly Centre, Canton Lane - Solar Panels

BAC Jaguar Land Rover Battery Assembly Centre, Canton Lane - Solar Panels is a permitted solar power plant in North Warwickshire, England, United Kingdom, with 2.2 MW of capacity, operated by Columbia Threadneedle Investments Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth Warwickshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressBAC Jaguar Land Rover Battery Assembly Centre, Unit 6a, Hams Hall Distribution Park, B46 1GBDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date4 Mar 2024 (permit PAP/2024/0034, Town and Country Planning Act, issued by North Warwickshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date26 Jan 2024 (reference PAP/2024/0034, planning authority North Warwickshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date4 Mar 2024 (granted, reference PAP/2024/0034, planning authority North Warwickshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorColumbia Threadneedle Investments Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity2.2 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.5316, -1.7014DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority North Warwickshire, reference PAP/2024/0034)
  2. Permit applied for (planning authority North Warwickshire, reference PAP/2024/0034)

How it compares

BAC Jaguar Land Rover Battery Assembly Centre, Canton Lane - Solar Panels is the 1,416th-largest of 1,650 power plants planned, permitted or under construction in England and the 2,248th-largest of 2,548 in the United Kingdom by capacity; its 2.2 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,416th of 1,650171,264 MW<0.1%
United Kingdom2,248th of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data5,454th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 7 data centers, measured from the coordinates in the facts above. The table shows the nearest 3.

NameKindSizeStatusDistance
EE Data CentreData center——22 km
Data center, England (OSM way 710050084)Data center——22 km
Hutchison 3GData center——22 km

Operator and place

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page