Power plant · Forest of Dean, England, United Kingdom

Awre Penisular Farmer's Community Solar Scheme

Awre Penisular Farmer's Community Solar Scheme is a cancelled solar power plant in Forest of Dean, England, United Kingdom, with 49.9 MW of capacity, operated by Awre Peninsula Farmers' Community Solar Scheme.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationForest of Dean (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand At Guy Hall Farm, Northington Lane, Awre, Newnham, GL14 1ELDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date4 Jun 2015 (reference P0664/15/FUL, planning authority Forest of Dean)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date19 Jan 2016 (refused, reference P0664/15/FUL, planning authority Forest of Dean)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorAwre Peninsula Farmers' Community Solar Scheme (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity49.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area109 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.7752, -2.4188DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority Forest of Dean, reference P0664/15/FUL)
  2. Permit applied for (planning authority Forest of Dean, reference P0664/15/FUL)

How it compares

Awre Penisular Farmer's Community Solar Scheme is the 305th-largest of 4,035 power plants in England and the 538th-largest of 5,834 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England305th of 4,035134,434 MW<0.1%
United Kingdom538th of 5,834200,500 MW<0.1%
All power plants in our data3,763rd of 15,8001,923,633 MW<0.1%

Nearby

Within 50 km of this power plant: 79 grid connections (48 operating, 711 MW), 39 substations, 10 data centers and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
DXC TechnologyData center——12 km
Tetbury PrimarySubstation——24 km
Marsh Farm B PV grid connectionGrid connection11.4 MWOperating28 km
Kemble RAF PrimarySubstation——28 km
Alderton PrimarySubstation——28 km
Long Newton PV grid connectionGrid connection5.8 MWOperating28 km
Sunstroom grid connectionGrid connection4.28 MWOperating28 km
nLighten BristolData center——28 km
University of Bristol Isambard-AIAI supercomputer5,448 H100eOperating31 km

Operator and place

More from Awre Peninsula Farmers' Community Solar Scheme

Other power plants in England

All 5872 power plants in England, United Kingdom