Power plant · Thurrock, England, United Kingdom

Aveley Landfill Scheme

Aveley Landfill Scheme is a biomass power plant in Thurrock, England, United Kingdom, with 2.1 MW of capacity, operated by Waste Recycling Group.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationThurrock (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressSandy Lane Aveley EssexDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year1999DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date4 Jun 1998 (Town and Country Planning Act, issued by Thurrock)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date13 Jan 1998 (planning authority Thurrock)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date4 Jun 1998 (granted, planning authority Thurrock)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorWaste Recycling GroupDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity2.1 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyLandfill GasDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.5043, 0.2381DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Thurrock)
  3. Permit applied for (planning authority Thurrock)

How it compares

Aveley Landfill Scheme is the 3,271st-largest of 4,036 power plants in England and the 4,795th-largest of 5,837 in the United Kingdom by capacity; its 2.1 MW is <0.1% of the 200,833 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England3,271st of 4,036134,406 MW<0.1%
United Kingdom4,795th of 5,837200,833 MW<0.1%
All power plants in our data11,240th of 13,0281,354,089 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 98 data centers (1 operating, 88 MW), 43 substations, 12 grid connections (5 operating, 21.8 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Fujitsu Data CentreData center——3.4 km
OVH data center, EnglandData center——5.1 km
CustodianDC DA2Data center——5.8 km
North London (Electricity Line) ReinforcementTransmission line—Permitted23 km
Tertiary Study grid connectionGrid connection57 MWPlanned23 km
NVIDIA Cambridge-1AI supercomputer202 H100eOperating30 km
Ariel Way White City London grid connectionGrid connection2.2 MWOperating32 km
Goldsmiths PrimarySubstation——34 km
Volt Avenue PrimarySubstation——34 km

Operator and place

More from Waste Recycling Group

Other power plants in England

All 5876 power plants in England, United Kingdom

Data on this page