Power plant · South Kesteven, England, United Kingdom

Ash Tree Solar Farm & Battery Storage

Ash Tree Solar Farm & Battery Storage is a permitted power plant in South Kesteven, England, United Kingdom, with 25 MW of capacity, operated by Low Carbon.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSouth Kesteven (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressHigh Dike Road Londonthorpe, NG31 9ERDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (appeal granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date18 Jul 2025 (permit S23/2199, Town and Country Planning Act, issued by South Kesteven)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date29 Nov 2023 (reference S23/2199, planning authority South Kesteven)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date18 Jul 2025 (granted, reference S23/2199, planning authority South Kesteven)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date25 Oct 2024 (refused, reference S23/2199, planning authority South Kesteven)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date18 Jul 2025 (appeal granted, reference S23/2199, planning authority South Kesteven)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorLow CarbonDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity25 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (co-located with re)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.9124, -0.5790DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (appeal granted, planning authority South Kesteven, reference S23/2199)
  2. Permit granted (planning authority South Kesteven, reference S23/2199)
  3. Permit refused (planning authority South Kesteven, reference S23/2199)
  4. Permit applied for (planning authority South Kesteven, reference S23/2199)

How it compares

Ash Tree Solar Farm & Battery Storage is the 1,108th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,741st-largest of 3,222 in the United Kingdom by capacity; its 25 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,108th of 2,174185,888 MW<0.1%
United Kingdom1,741st of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data3,376th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 5 data centers, 4 grid connections (14.4 MW), 3 transmission lines and 1 substation, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Digital Space DC - NewarkData center——23 km
Triton Knoll Electrical SystemTransmission line—Permitted24 km
Weston Marsh to East LeicestershireTransmission line—Planned29 km
Eastern Green Link 3 and Eastern Green Link 4Transmission line—Planned34 km
ExperianData center——38 km
Hall Water Treatment Works grid connectionGrid connection1.6 MWOperating40 km
Newton on Trent Water Works grid connectionGrid connection3.1 MWOperating41 km
nLighten NottinghamData center——44 km
StowSubstation——46 km

Operator and place

More from Low Carbon

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page