Power plant · Wiltshire, England, United Kingdom
Apetito, Canal Road - Solar Panels
Apetito, Canal Road - Solar Panels is a permitted power plant in Wiltshire, England, United Kingdom, with 1.33 MW of capacity, operated by Apetito UK Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Wiltshire (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Apetito, Canal Road, BA14 8RJ | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 12 Sept 2024 (permit PL/2024/06620, Town and Country Planning Act, issued by Wiltshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 25 Jul 2024 (reference PL/2024/06620, planning authority Wiltshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 12 Sept 2024 (granted, reference PL/2024/06620, planning authority Wiltshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Apetito UK Limited | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 1.33 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.3299, -2.2022 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority Wiltshire, reference PL/2024/06620)
- Permit applied for (planning authority Wiltshire, reference PL/2024/06620)
How it compares
Apetito, Canal Road - Solar Panels is the 1,972nd-largest of 2,174 power plants planned, permitted or under construction in England and the 2,971st-largest of 3,222 in the United Kingdom by capacity; its 1.33 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,972nd of 2,174 | 185,888 MW | <0.1% |
| United Kingdom | 2,971st of 3,222 | 300,461 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 6,196th of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 186 grid connections (115 operating, 1,200 MW), 99 substations, 8 data centers, 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Cock Hill PV grid connection | Grid connection | 14.6 MW | Operating | 1.6 km |
| Trowbridge Town Primary | Substation | — | — | 1.6 km |
| Ashton Park Primary | Substation | — | — | 1.7 km |
| Nestle Co Ltd grid connection | Grid connection | 5.18 MW | Operating | 2.0 km |
| Manor Court Farm PV grid connection | Grid connection | 4.18 MW | Operating | 2.2 km |
| Bradford-On-Avon Primary | Substation | — | — | 5.0 km |
| Data center, England (OSM way 996865179) | Data center | — | — | 9.8 km |
| Ark Data Centres | Data center | — | — | 9.9 km |
| University of Bristol Isambard-AI | AI supercomputer | 5,448 H100e | Operating | 27 km |
Operator and place
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Epoch AI. Epoch AI supercomputers, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.