Power plant · Staffordshire Moorlands, England, United Kingdom

Adj New House Farm, Luzlow Lane - Battery Energy Storage

Adj New House Farm, Luzlow Lane - Battery Energy Storage is a cancelled power plant in Staffordshire Moorlands, England, United Kingdom, with 99 MW of capacity, operated by YLEM South Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationStaffordshire Moorlands (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressAdjoining, New House Farm, Luzlow Lane, Bagnall, ST9 9JZDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date18 Feb 2025 (reference SMD/2024/0568, planning authority Staffordshire Moorlands)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date12 Dec 2025 (refused, reference SMD/2024/0568, planning authority Staffordshire Moorlands)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorYLEM South Limited (YLEM (BESS) South Limited, applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity99 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.0416, -2.0941DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority Staffordshire Moorlands, reference SMD/2024/0568)
  2. Permit applied for (planning authority Staffordshire Moorlands, reference SMD/2024/0568)

How it compares

Adj New House Farm, Luzlow Lane - Battery Energy Storage is the 123rd-largest of 3,953 power plants in England and the 200th-largest of 5,723 in the United Kingdom by capacity; its 99 MW is <0.1% of the 136,106 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England123rd of 3,95385,679 MW0.12%
United Kingdom200th of 5,723136,106 MW<0.1%
All power plants in our data1,312th of 12,7051,210,931 MW<0.1%

Nearby

Within 50 km of this power plant: 113 substations, 97 grid connections (56 operating, 535 MW), 11 data centers, 3 gas storage facilities and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Internet Central data center, EnglandData center——12 km
Dane Moss Solar PV grid connectionGrid connection7.5 MWPlanned22 km
Danes Moss Landfill Site 2 grid connectionGrid connection2.1 MWOperating23 km
Danes Moss Landfill Site 3 grid connectionGrid connection1.01 MWOperating23 km
S.E. MacclesfieldSubstation——23 km
S.W. MacclesfieldSubstation——24 km
Withyfold DriveSubstation——25 km
Salinae Hydrogen Storage projectGas storage facility—Planned27 km
Keuper Gas Storage ProjectGas storage facility—Permitted31 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page