Power plant · Blaby, England, United Kingdom

A C Shropshire (Farm AD)

A C Shropshire (Farm AD) is a biomass power plant in Blaby, England, United Kingdom, with 2.5 MW of capacity, operated by PROjEN.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBlaby (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressGreen Lodge Farm, Forest Road, Huncote, Leicester, LE9 3LEDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2013DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date11 Jan 2010 (permit 09/0564/1/CX, Town and Country Planning Act, issued by Blaby)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date18 Sept 2009 (reference 09/0564/1/CX, planning authority Blaby)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date11 Jan 2010 (granted, reference 09/0564/1/CX, planning authority Blaby)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorPROjENDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity2.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyAnaerobic DigestionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.5866, -1.2345DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Blaby, reference 09/0564/1/CX)
  3. Permit applied for (planning authority Blaby, reference 09/0564/1/CX)

How it compares

A C Shropshire (Farm AD) is the 3,154th-largest of 4,036 power plants in England and the 4,575th-largest of 5,837 in the United Kingdom by capacity; its 2.5 MW is <0.1% of the 200,833 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England3,154th of 4,036134,406 MW<0.1%
United Kingdom4,575th of 5,837200,833 MW<0.1%
All power plants in our data10,862nd of 13,0281,354,089 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 7 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.

NameKindSizeStatusDistance
Santander data center, EnglandData center——1.8 km
Santander data center, EnglandData center——1.9 km
Data center, England (OSM way 710050084)Data center——11 km
Weston Marsh to East LeicestershireTransmission line—Planned30 km

Operator and place

Other power plants in England

All 5876 power plants in England, United Kingdom

Data on this page