Grid connections

Grid connections in Pennsylvania, United States

Rare Context lists 204 grid connections in Pennsylvania, United States, with 46,972 MW of capacity between them. The largest is Bruce Mansfield 345 kV grid connection (PJM C01-1243) (2,500 MW).

All grid connections

Sorted by capacity.

Grid connectionCountyHolderCapacity
Bruce Mansfield 345 kV grid connection (PJM C01-1243)Beaver CountyShippingport Power Station, LLC2,500 MW
Homer City 345 kV grid connection (PJM C01-1097)Indiana CountyHomer City Generation, L.P.1,736 MW
Lackawanna - Hopatcong 500 kV grid connection (PJM C01-1193)Lackawanna CountyInvitium Energy, LLC1,500 MW
Susquehanna T10 - Susquehanna 230 kV grid connection (PJM C01-1195)Luzerne CountyInvitium Energy, LLC1,500 MW
Shenango - McClelland 345 kV grid connection (PJM C01-1594)Lawrence CountyInvenergy Clean Power Development LLC1,489 MW
Susquehanna - Mountain 230 kV & Susquehanna T10 - Mountain 230 kV grid connection (PJM C01-1592)Luzerne CountyNewport Ridge Energy Center LLC1,486 MW
Tomhicken 230 kV grid connection (PJM C01-1590)Luzerne CountyInvenergy Clean Power Development LLC1,486 MW
Collier - Clinton 345 kV grid connection (PJM C01-1440)Washington CountyCPV Power Holdings, LP1,465 MW
Yukon - Southbend 500 kV grid connection (PJM C01-1396)Indiana CountyCPV Power Holdings, LP1,465 MW
Hatfield - Rhodes Lane 500 kV grid connection (PJM C01-2105)Fayette CountyE Riverside Energy Center, LLC1,400 MW
Hatfield - Rhodes Lane 500 kV grid connection (PJM C01-2228)Fayette CountyDunbar ProjectCo, LLC1,365 MW
Lackawanna - Hopatcong 500 kV grid connection (PJM C01-2229)Wayne CountyForest City ProjectCo, LLC1,365 MW
Hatfield - Rhodes Lane 500 kV grid connection (PJM C01-1763)Fayette CountyE Riverside Energy Center, LLC1,300 MW
Black Oak - Hatfield 500 kV grid connection (PJM C01-1958)Fayette CountyCortex Sycamore, LLC976 MW
Hatfield 500 kV grid connection (PJM C01-1960)Greene CountyCortex Sycamore, LLC976 MW
Hunterstown 230 kV grid connection (PJM C01-1881)Adams CountyHunterstown II Generation, LLC976 MW
Lackawanna - Shickshinny 500 kV grid connection (PJM C01-2022)Luzerne CountyCortex Sycamore, LLC976 MW
Three Mile Island 230 kV grid connection (PJM AH1-695 - moved to TC2)Dauphin CountyPJM Interconnection, L.L.C.859 MW
Three Mile Island 230 kV grid connection (PJM AH1-695)Dauphin CountyConstellation Energy Generation, LLC859 MW
Mitchell - Wilson 138 kV & Clairton - Piney 138 kV grid connection (PJM C01-2149)Allegheny CountyGemini Elrama, LLC800 MW
Homer City 230 kV grid connection (PJM C01-1250)Indiana CountyHomer City Generation, L.P.780 MW
Hatfield 500 kV grid connection (PJM C01-1723)Greene CountyVerde Ridge Energy Center LLC750 MW
Jenkins - Palooka 230 kV grid connection (PJM C01-1192)Luzerne CountyInvitium Energy, LLC750 MW
Juniata - Bernheisel 500 kV grid connection (PJM C01-1197)Perry CountyInvitium Energy, LLC750 MW
Lackawanna - Hopatcong 500 kV grid connection (PJM C01-1194)Lackawanna CountyInvitium Energy, LLC750 MW
Wylie Ridge - Tidd 345 kV grid connection (PJM C01-1630)Washington CountySeven Creek Energy, LLC750 MW
Montour 230 kV grid connection (PJM C01-1176)Montour CountyMontour LLC640 MW
Evergreen Ridge Power grid connection (NYISO C26-0001-1)Tioga CountyEvergreen Ridge Power, LLC624 MW
Handsome Lake 345 kV grid connection (PJM C01-2224)Venango CountyScrubgrass Reclamation Company, L.P.550 MW
Wayne 345 kV grid connection (PJM C01-1550)Crawford CountyENGIE IR Holdings LLC530 MW
Hunterstown 500 kV grid connection (PJM C01-1398)Adams CountyHunterstown Generation, LLC455 MW
Mineral Basin Solar Power grid connection (NYISO 1080)Clearfield CountyMineral Basin Solar Power, LLC402 MW
McDowell 138 kV grid connection (PJM C01-2166)Mercer CountyREPA Wayside Church Solar, LLC400 MW
Shallow Seam BESS grid connection (NYISO C24-233)Clearfield CountyShallow Seam Energy Storage, LLC400 MW
Limerick 500 kV grid connection (PJM C01-1055)Montgomery CountyConstellation Energy Generation, LLC382 MW
Patriot Forge Energy Center grid connection (NYISO C26-0029-2)Tioga CountyPatriot Forge PA, LLC350 MW
South Bend 500 kV grid connection (PJM C01-1750)Armstrong CountyArmstrong Power, LLC339 MW
Stargazer I grid connection (NYISO C24-175)Mckean CountyRWE Solar Development, LLC325 MW
Stargazer II grid connection (NYISO C24-176)Mckean CountyRWE Solar Development, LLC325 MW
Martins Creek 230 kV grid connection (PJM C01-1800)Northampton CountyMC Project Company LLC300 MW
Martins Creek 230 kV grid connection (PJM C01-2037)Northampton CountyMC Project Company LLC300 MW
Wilson 138kV grid connection (PJM C01-1568)Allegheny CountyENGIE IR Holdings LLC300 MW
South Bend 500 kV grid connection (PJM AH1-734 - moved to TC2)Indiana CountyPJM Interconnection, L.L.C.270 MW
South Bend 500 kV grid connection (PJM AH1-734)Indiana CountyArmstrong Power, LLC270 MW
Handsome Lake - Armstrong 345 kV grid connection (PJM C01-2133)Venango CountySP Resilient Power 13, LLC250 MW
Keisters 138 kV grid connection (PJM C01-2165)Butler CountyREPA Kiester Road Solar, LLC250 MW
Moonlight Flats Solar grid connection (NYISO C24-301)Clearfield CountyMoonlight Flats Solar Power, LLC250 MW
Shickshinny 500 kV grid connection (PJM C01-1801)Luzerne CountyMoxie Freedom LLC250 MW
Shickshinny 500 kV grid connection (PJM C01-2038)Luzerne CountyMoxie Freedom LLC250 MW
Burma - Armstrong 138 kV grid connection (PJM C01-1368)Clarion CountyGardenia Solar, LLC200 MW
Cambria Slope 115 kV grid connection (PJM C01-1175)Cambria CountyIdemitsu Renewables America Development LLC200 MW
Cornerstone Solar grid connection (PJM AH1-545)Washington CountyCornerstone Solar, LLC200 MW
Erie West - Wayne 345 kV grid connection (PJM C01-2015)Crawford CountyLightsource Renewable Energy Development LLC200 MW
Gans - South Union 138 kV grid connection (PJM C01-1627)Fayette CountyENGIE IR Holdings LLC200 MW
Johnstown 230 kV grid connection (PJM C01-2043)Cambria CountySP Resilient Power 12, LLC200 MW
Vanceville 138 kV grid connection (PJM C01-1174)Washington CountyIdemitsu Renewables America Development LLC200 MW
Wylie Ridge-Tidd 345kV grid connection (PJM AH1-545 - moved to TC2)Washington CountyPJM Interconnection, L.L.C.200 MW
Clinton 138 kV grid connection (PJM C01-1233)Allegheny CountyPA-202 LLC180 MW
Kimberlite Solar grid connection (NYISO C24-300)Clearfield CountyKimberlite Solar Power, LLC175 MW
Energy Mountain grid connection (PJM AD2-077)Bucks CountyPJM Interconnection, L.L.C.150 MW
Erie South-Union City 115 kV grid connection (PJM AG1-548 - moved to TC1)Erie CountyPJM Interconnection, L.L.C.150 MW
French Creek Solar and BESS grid connection (PJM AG1-548)Erie CountyFrench Creek Energy, LLC150 MW
Hoytdale 138 kV grid connection (PJM AG2-621 - moved to TC2)Beaver CountyPJM Interconnection, L.L.C.150 MW
Hoytdale 138 kV grid connection (PJM AG2-621)Beaver CountyACE Development Company, LLC150 MW
Elko - Shawville 230 kV grid connection (PJM C01-1225)Elk CountyWhetstone Wind LLC135 MW
Madera - Bionol 115 kV grid connection (PJM C01-1746)Clearfield CountyClemente Solar LLC130 MW
Grandview - Haynie 115 kV grid connection (PJM C01-1664)Clarion CountyClarion Crest Solar, LLC127 MW
Clermont Solar grid connection (PJM AE2-113)Mckean CountyPJM Interconnection, L.L.C.120 MW
Venango Junction - Edinboro South 115 kV grid connection (PJM C01-1081)Crawford CountyLightsource Renewable Energy Development LLC117 MW
Hoodlebug Solar Energy Center grid connection (PJM AF1-272)Indiana CountyPJM Interconnection, L.L.C.110 MW
Utica Junction 115 kV grid connection (PJM C01-1545)Venango CountySleepy Hollow Generating, LLC110 MW
Rogue's Wind grid connection (PJM AF1-086)Clearfield CountyPJM Interconnection, L.L.C.110 MW
Nescopeck - Tomhicken 230 kV grid connection (PJM C01-1638)Luzerne CountyAmpliform Development LLC100 MW
Rockdale Solar grid connection (PJM AF1-143)Somerset CountyPJM Interconnection, L.L.C.100 MW
Black Moshannon Solar grid connection (PJM AG1-090)Centre CountyCE-Black Moshannon OZ LLC95 MW
Philipsburg 115 kV grid connection (PJM AG1-090 - moved to TC1)Centre CountyPJM Interconnection, L.L.C.95 MW
Squab Solar grid connection (PJM AE2-316)Jefferson CountyPJM Interconnection, L.L.C.90 MW
Eldred - Cleveland 69 kV grid connection (PJM C01-1219)Northumberland CountyReliance Wind LLC88.3 MW
MPG Solar grid connection (PJM AE2-262)Centre CountyPJM Interconnection, L.L.C.83.6 MW
Lardin - Lake Lynn 138kV grid connection (PJM AH1-249 - moved to TC2)Fayette CountyPJM Interconnection, L.L.C.80 MW
Poseidon Storage grid connection (PJM AH1-249)Fayette CountyPoseidon Energy, LLC80 MW
Walker Solar Two grid connection (PJM AF2-361)Juniata CountyPJM Interconnection, L.L.C.80 MW
Wilson Solar grid connection (PJM AF1-098)Erie CountyPJM Interconnection, L.L.C.80 MW
MPG Solar grid connection (PJM AE2-263)Centre CountyPJM Interconnection, L.L.C.78.4 MW
Beaver Valley 345 kV grid connection (PJM C01-1503)Beaver CountyVistra Nuclear Operations Company70 MW
Beaver Valley 345 kV grid connection (PJM C01-1504)Beaver CountyVistra Nuclear Operations Company70 MW
Granite Hill Solar grid connection (PJM AE2-345)Adams CountyPJM Interconnection, L.L.C.70 MW
Statler Hill 115 kV grid connection (PJM AG2-411 - moved to TC2)Somerset CountyPJM Interconnection, L.L.C.63 MW
Statler Hill 115 kV grid connection (PJM AG2-411)Somerset CountyIris Energy LLC63 MW
Bethelboro 138 kV grid connection (PJM AH1-206 - moved to TC2)Fayette CountyPJM Interconnection, L.L.C.60 MW
Lafayette Storage grid connection (PJM AH1-206)Fayette CountyLafayette Energy, LLC60 MW
Mora Solar grid connection (PJM AG1-156)Carbon CountyPJM Interconnection, L.L.C.60 MW
Boonetown 230 kV grid connection (PJM C01-1319)Berks CountyBirdsboro Power LLC55 MW
Dover Solar grid connection (PJM AE2-211)York CountyPJM Interconnection, L.L.C.55 MW
East Sayre - Solteir 115 kV grid connection (PJM C01-1668)Bradford CountyTowanda Storage, LLC50 MW
Frackville - Gilberton 69 kV grid connection (PJM C01-2135)Schuylkill CountyMountain City Solar, LLC50 MW
Maple Hill-Fiddlers 1 SP (Bear Rock) grid connection (PJM AF2-050 - moved to TC1)Cambria CountyPJM Interconnection, L.L.C.50 MW
Maple Hill-Fiddlers 1 SP (Bear Rock) grid connection (PJM AF2-050)Cambria CountyCPV Maple Hill Solar, LLC50 MW
MC Solar grid connection (PJM AE2-285)Mercer CountyPJM Interconnection, L.L.C.50 MW
Eagle Valley 115 kV grid connection (PJM C01-1275)Centre CountySandy Ridge Transco Interconnection, LLC48.6 MW
Peach Bottom Units #2 & #3 grid connection (PJM AB2-175)York CountyPJM Interconnection, L.L.C.44 MW
Squab Solar grid connection (PJM AF1-302)Jefferson CountyPJM Interconnection, L.L.C.42 MW
Green Meadows Solar grid connection (PJM AG1-054)Lawrence CountyPJM Interconnection, L.L.C.40 MW
Harwood - McAdoo Tap 2 69 kV grid connection (PJM C01-1244)Luzerne CountyAudenried Solar, LLC40 MW
Lardin - Lake Lynn 138kV grid connection (PJM AH1-247 - moved to TC2)Fayette CountyPJM Interconnection, L.L.C.40 MW
Poseidon Solar 1 grid connection (PJM AH1-247)Fayette CountyPoseidon Energy, LLC40 MW
Washington West Solar grid connection (PJM AF2-234)Snyder CountyPJM Interconnection, L.L.C.40 MW
Meckesville Tap 69kV grid connection (PJM AG2-074 - moved to TC2)Carbon CountyPJM Interconnection, L.L.C.38 MW
Meckesville Tap 69kV grid connection (PJM AG2-074)Carbon CountyPlainfield Solar, LLC38 MW
Cottontail Solar 7 grid connection (PJM AF1-226)Columbia CountyPJM Interconnection, L.L.C.35 MW
Mehoopany 115 kV grid connection (PJM C01-1280)Wyoming CountyMehoopany Wind Energy LLC34.5 MW
Hector 115 kV grid connection (PJM C01-2126)Potter CountyBig Level Wind LLC32 MW
Lackawanna 230 kV grid connection (PJM C01-1170)Lackawanna CountyLackawanna Energy Center LLC32 MW
Neversink 69 kV grid connection (PJM C01-2240)Berks CountyEvergreen Community Power, LLC28 MW
Rhodes Lane 500 kV grid connection (PJM C01-1267)Westmoreland CountyTenaska Pennsylvania Partners, LLC28 MW
Eclipse #2 34.5 kV grid connection (PJM AG2-420 - moved to TC2)Venango CountyPJM Interconnection, L.L.C.25 MW
Eclipse #2 34.5 kV grid connection (PJM AG2-420)Venango CountyBear Oak Solar LLC25 MW
Lardin - Lake Lynn 138kV grid connection (PJM AH1-248 - moved to TC2)Fayette CountyPJM Interconnection, L.L.C.25 MW
Poseidon Solar 2 grid connection (PJM AH1-248)Fayette CountyPoseidon Energy, LLC25 MW
BL-Hileman Hollow grid connection (PJM AG1-281)Blair CountyPJM Interconnection, L.L.C.20 MW
Black Moshannon Solar grid connection (PJM AG1-377 - moved to TC1)Centre CountyPJM Interconnection, L.L.C.20 MW
Black Moshannon Solar grid connection (PJM AG1-377)Centre CountyCE-Black Moshannon OZ LLC20 MW
Black Moshannon Solar grid connection (PJM AG1-378 - moved to TC1)Centre CountyPJM Interconnection, L.L.C.20 MW
Black Moshannon Solar grid connection (PJM AG1-378)Centre CountyCE-Black Moshannon OZ LLC20 MW
CL- Belsena Solar grid connection (PJM AF2-296 - moved to TC1)Clearfield CountyPJM Interconnection, L.L.C.20 MW
CL- Belsena Solar grid connection (PJM AF2-296)Clearfield CountyCL-Belsena LLC20 MW
CL-Green Acres grid connection (PJM AF1-134)Clearfield CountyPJM Interconnection, L.L.C.20 MW
Club Ford Energy Center grid connection (PJM AF2-421)Adams CountyPJM Interconnection, L.L.C.20 MW
Club Ford Energy Center grid connection (PJM AG1-164)Luzerne CountyPJM Interconnection, L.L.C.20 MW
Club Ford Energy Center grid connection (PJM AG1-165)Luzerne CountyPJM Interconnection, L.L.C.20 MW
Dover Solar grid connection (PJM AF1-057)York CountyPJM Interconnection, L.L.C.20 MW
Dubois 34.5 kV grid connection (PJM C01-2127)Clearfield CountyAM Energy Resources LLC20 MW
Farmers Valley Solar grid connection (PJM AF2-238)Bradford CountyPJM Interconnection, L.L.C.20 MW
Franklin Solar grid connection (PJM AF1-094)Crawford CountyPJM Interconnection, L.L.C.20 MW
Frosty Valley Energy Center grid connection (PJM AF2-433)Columbia CountyPJM Interconnection, L.L.C.20 MW
Frosty Valley Energy Center grid connection (PJM AF2-434)Columbia CountyPJM Interconnection, L.L.C.20 MW
Glory - Glen Campbell 34.5 kV grid connection (PJM AG2-561 - moved to TC2)Indiana CountyPJM Interconnection, L.L.C.20 MW
Glory - Glen Campbell 34.5 kV grid connection (PJM AG2-561)Indiana CountyChestnut Solar LLC20 MW
Green Meadows Solar grid connection (PJM AG2-236)Lawrence CountyHarlansburg PV I, LLC20 MW
Henry Solar grid connection (PJM AG1-100)Crawford CountyPJM Interconnection, L.L.C.20 MW
HU-Logging grid connection (PJM AE2-118)Huntingdon CountyPJM Interconnection, L.L.C.20 MW
HU-Pauls grid connection (PJM AE2-117)Huntingdon CountyPJM Interconnection, L.L.C.20 MW
Jackson Center Solar Facility grid connection (PJM AE1-183)Mercer CountyPJM Interconnection, L.L.C.20 MW
Jackson Center Solar II grid connection (PJM AF1-093)Mercer CountyPJM Interconnection, L.L.C.20 MW
Jakes Hollow Solar grid connection (PJM AF1-153)Elk CountyPJM Interconnection, L.L.C.20 MW
Limestone Solar grid connection (PJM AF1-333)Union CountyPJM Interconnection, L.L.C.20 MW
Limestone Solar grid connection (PJM AF1-337)Union CountyPJM Interconnection, L.L.C.20 MW
Limestone Solar grid connection (PJM AF1-338)Union CountyPJM Interconnection, L.L.C.20 MW
Limestone Solar grid connection (PJM AF1-339)Union CountyPJM Interconnection, L.L.C.20 MW
Momentum Gratz grid connection (PJM AF1-040)Dauphin CountyPJM Interconnection, L.L.C.20 MW
Montour 1 grid connection (PJM AE2-110)Columbia CountyPJM Interconnection, L.L.C.20 MW
Mountain Holly grid connection (PJM AE2-241)Columbia CountyPJM Interconnection, L.L.C.20 MW
Nichols Solar grid connection (PJM AG1-040)Crawford CountyPJM Interconnection, L.L.C.20 MW
Philipsburg 34.5 kV grid connection (PJM C01-2134)Clearfield CountyAM Energy Resources LLC20 MW
Potter-Harlan 69 kV grid connection (PJM AG2-236 - moved to TC2)Lawrence CountyPJM Interconnection, L.L.C.20 MW
Shamrock Energy Center grid connection (PJM AF2-424)Northumberland CountyPJM Interconnection, L.L.C.20 MW
Shamrock Energy Center grid connection (PJM AF2-425)Adams CountyPJM Interconnection, L.L.C.20 MW
SunEast Hooversville Solar grid connection (PJM AF1-321)Somerset CountyPJM Interconnection, L.L.C.20 MW
SunEast Hooversville Solar grid connection (PJM AF2-001)Somerset CountyPJM Interconnection, L.L.C.20 MW
Timblin 34.5 kV grid connection (PJM C01-1845)Jefferson CountyKeystone Agripower, Inc.20 MW
UN-Kylertown grid connection (PJM AE2-131)Westmoreland CountyPJM Interconnection, L.L.C.20 MW
WA-Cochecton 2 grid connection (PJM AF2-417)Adams CountyPJM Interconnection, L.L.C.20 MW
Washington East Solar grid connection (PJM AF2-233)Snyder CountyPJM Interconnection, L.L.C.20 MW
Welcome Solar II grid connection (PJM AE1-237)Crawford CountyPJM Interconnection, L.L.C.19.9 MW
Welcome Solar, LLC grid connection (PJM AE1-079)Mercer CountyPJM Interconnection, L.L.C.19.9 MW
Stoneybrook Solar grid connection (PJM AF2-086)Columbia CountyPJM Interconnection, L.L.C.19.6 MW
Reed - Reed Tap #1 69 kV grid connection (PJM C01-1029)Northumberland CountyWildcat Renewables, LLC19.4 MW
Welcome Solar III grid connection (PJM AE2-343)Crawford CountyPJM Interconnection, L.L.C.17.9 MW
Thompson 34.5 kV grid connection (PJM AF2-294)Wayne CountyPJM Interconnection, L.L.C.17 MW
BL-Diamond Bear Rocks grid connection (PJM AF1-140)Adams CountyPJM Interconnection, L.L.C.16.3 MW
CE-Filmore grid connection (PJM AE2-248)Centre CountyPJM Interconnection, L.L.C.16 MW
FU-Hanks Solar grid connection (PJM AF1-136)Fulton CountyPJM Interconnection, L.L.C.15.7 MW
North Warren - Russell 34.5 kV grid connection (PJM AG2-200 - moved to TC2)Warren CountyPJM Interconnection, L.L.C.15.3 MW
North Warren - Russell 34.5 kV grid connection (PJM AG2-200)Warren CountySugaree Solar LLC15.3 MW
Morgan Street-Cochranton 34.5 kV grid connection (PJM AG1-197)Crawford CountyPJM Interconnection, L.L.C.15 MW
Stony Creek Solar grid connection (PJM AF2-221)Somerset CountyPJM Interconnection, L.L.C.15 MW
Uniontown - Footedale 25 kV grid connection (PJM C01-1897)Fayette CountyOriden LLC14 MW
CL-Route 58 B grid connection (PJM AF1-167)Clarion CountyPJM Interconnection, L.L.C.13.5 MW
Abes Run Solar grid connection (PJM AF2-039)Clearfield CountyPJM Interconnection, L.L.C.13.5 MW
New Baltimore 115 kV grid connection (PJM C01-1702)Somerset CountyStony Creek Wind Farm, LLC13 MW
Statler Hill 115 kV grid connection (PJM C01-1807)Somerset CountyForward WindPower LLC12.9 MW
Newville-Nottingham Tap 1 69 kV grid connection (PJM AG2-166 - moved to TC2)Cumberland CountyPJM Interconnection, L.L.C.10 MW
Newville-Nottingham Tap 1 69 kV grid connection (PJM AG2-166)Cumberland CountyCosten Solar, Inc10 MW
SunEast Hooversville Solar grid connection (PJM AF2-002)Somerset CountyPJM Interconnection, L.L.C.10 MW
Abes Run Solar grid connection (PJM AF2-088)Clearfield CountyPJM Interconnection, L.L.C.6.5 MW
Rankin - Wilmerding 23 kV grid connection (PJM C01-1031)Allegheny CountyLock+ Hydro Friends Fund XLII, LLC5.25 MW
Findlay-Clinton 23 kV grid connection (PJM AG2-037 - moved to TC2)Allegheny CountyPJM Interconnection, L.L.C.4.7 MW
Findlay-Clinton 23 kV grid connection (PJM AG2-037)Allegheny CountyPG Solar LLC4.7 MW
Mifflintown Bus-Mifflintown Tap 69 kV II grid connection (PJM AG2-484 - moved to TC2)Juniata CountyPJM Interconnection, L.L.C.4.6 MW
Mifflintown Bus-Mifflintown Tap 69 kV II grid connection (PJM AG2-484)Juniata CountyCottontail Solar 5, LLC4.6 MW
Derry Tap-Derry Bus 69 kV III grid connection (PJM AG2-481 - moved to TC2)Northumberland CountyPJM Interconnection, L.L.C.4.1 MW
Derry Tap-Derry Bus 69 kV III grid connection (PJM AG2-481)Northumberland CountyCottontail Solar 4, LLC4.1 MW
Penns Tap-Richfield Tie 69 kV II grid connection (PJM AG2-479 - moved to TC2)Snyder CountyPJM Interconnection, L.L.C.4.1 MW
Penns Tap-Richfield Tie 69 kV II grid connection (PJM AG2-479)Snyder CountyCottontail Solar 6, LLC4.1 MW
Greenfield CSG 1 grid connection (PJM AG1-253)Erie CountyPJM Interconnection, L.L.C.4 MW
Springfield CSG 1 grid connection (PJM AG1-251)Delaware CountyPJM Interconnection, L.L.C.3.88 MW
Carlisle Pike 23 kV grid connection (PJM C01-1709)Cumberland CountyNextEra Renewable Fuels, LLC2.93 MW
Great Lake Growers grid connection (PJM AG1-140)Erie CountyPJM Interconnection, L.L.C.2.62 MW
Cottontail Solar 1 grid connection (PJM AG2-478)York CountyCottontail Solar 1, LLC0.5 MW
Cottontail Solar 8 grid connection (PJM AG2-477)York CountyCottontail Solar 8, LLC0.5 MW
Hokes-Jackson 69 kV III grid connection (PJM AG2-477 - moved to TC2)York CountyPJM Interconnection, L.L.C.0.5 MW
Hokes-Jackson 69 kV IV grid connection (PJM AG2-478 - moved to TC2)York CountyPJM Interconnection, L.L.C.0.5 MW
Cottontail Solar 2 grid connection (PJM AG2-476)York CountyCottontail Solar 2, LLC0.1 MW
Hokes-Grantley 69 kV II grid connection (PJM AG2-476 - moved to TC2)York CountyPJM Interconnection, L.L.C.0.1 MW

Every grid connection in Pennsylvania, with holders.All 204 in one file, each with its holder, capacity and connection date. We research what the public sources leave out.