Bankhead Farm BESS grid connection is a planned grid connection in Scotland, United Kingdom, with 25 MW of capacity, held by GPC Battery Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationScotland (connection site: Devonside)SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (Accepted to Connect)SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
HolderGPC Battery LtdSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity25 MWSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSP Distribution plcSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date10 Nov 2023SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date30 Apr 2030 (target energisation)SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Bankhead Farm BESS grid connection is the 615th-largest of 1,518 grid connections in Scotland and the 1,653rd-largest of 4,493 in the United Kingdom by capacity; its 25 MW is <0.1% of the 459,551 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland615th of 1,51896,638 MW<0.1%
United Kingdom1,653rd of 4,493459,551 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Holder, grid operator and place

More from GPC Battery Ltd

Other grid connections in Scotland

All 1518 grid connections in Scotland, United Kingdom