Grid connection · England, United Kingdom

Markham Brook Solar Farm grid connection

Markham Brook Solar Farm grid connection is a grid connection in England, United Kingdom.

We hold more on this right.Capacity, connection date, grid operator, holder, location, status, technology and voltage: available on request.

Request this data

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceMARKHAM BROOK SOLAR FARM grid connectionNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
LocationAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
StatusAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
HolderAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
CapacityAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
TechnologyAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Grid operatorAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Connection dateAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
VoltageAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Coordinates51.4635, -2.6772NGED Connected Data portal · Terms not verified · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its owner? Ask us.

Nearby

Within 50 km of this grid connection: 494 power plants (199 operating, 1,876 MW), 33 substations, 11 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Haberfield Park Farm - Solar FarmPower plant5 MWPermitted0.3 km
Bristol Port / AvonmouthPower plant100 MWCancelled3.5 km
Etex Building Performance, Redland Avenue - Solar PanelsPower plant6.17 MWPermitted3.7 km
nLighten BristolData center——11 km
Hinkley Point C ConnectionTransmission line—Permitted16 km
Hinkley Point C Connection Project Material ChangeTransmission line—Planned18 km
Insight Data LtdData center——20 km
Vantage Data Centers - CWL13Data center——27 km
Bradford-On-Avon PrimarySubstation——31 km

Place

Other grid connections in England

All 3831 grid connections in England, United Kingdom