RARE CONTEXT Request research

Grid connection · England, United Kingdom

Crown Point Estate grid connection

Crown Point Estate grid connection is a grid connection in England, United Kingdom, with 6 MW of capacity, held by Low Carbon Farming 5 Limited.

Map: where Crown Point Estate grid connection lies
52.6057, 1.3395 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Trowse Grid 33kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderLow Carbon Farming 5 LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity6 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyGasUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date6 Oct 2021UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.6057, 1.3395UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

Crown Point Estate grid connection is the 2,165th-largest of 3,539 grid connections in England and the 3,023rd-largest of 4,870 in the United Kingdom by capacity; its 6 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,165th of 3,539341,715 MW<0.1%
United Kingdom3,023rd of 4,870467,981 MW<0.1%
All grid connections in our data6,701st of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 208 power plants (68 operating, 2,316 MW), 89 substations and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Trowse Grid 33kVSubstation——1.9 km
Land East of White Horse LanePower plant5 MWOperating2.0 km
White Horse Lane (Trowse) - Phase 2Power plant9 MWCancelled2.0 km
Burnham Thorpe Primary 11kVSubstation——2.2 km
Thorpe Bay Primary 11kVSubstation——2.2 km
Mulbarton Road, Keswick - Battery Energy Storage SystemPower plant400 MWPlanned4.3 km
Norwich to TilburyTransmission line—Planned5.7 km
LionLink InterconnectorTransmission line—Planned47 km

Holder, grid operator and place

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page