Data center · Laramie County, Wyoming, United States
CYS42 Datacenter
CYS42 Datacenter is a data center in Laramie County, Wyoming, United States, operated by Microsoft.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Laramie County, Wyoming | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Operator | Microsoft | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Building footprint | 5,614 m² (building) | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 41.1254, -104.9090 | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.
Request researchHow its operator compares
Microsoft owns 66 of the 1,336 data centers in the United States in our data with a named owner; 2 owners have more. Counts cover the data centers in our data that name an owner, holder or operator; an asset with several owners counts for each.
| Operator in United States | Rank | Data centers | Share |
|---|---|---|---|
| Amazon Web Services | 1st | 149 | 11% |
| Digital Realty | 2nd | 87 | 6.5% |
| Microsoft | 3rd | 66 | 4.9% |
| Amazon Data Services Inc. | 4th | 60 | 4.5% |
| 5th | 58 | 4.3% |
Nearby
Within 50 km of this data center: 4 power plants (1 operating, 800 MW) and 3 water rights, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Rawhide | Power plant | 800 MW | Operating | 31 km |
| Rawhide Res water right 0303952 46751.00000 | Water right | — | — | 32 km |
| North Poudre Canal water right 0300994 10989.00000 | Water right | — | — | 45 km |
| Cowboy Solar I | Power plant | 800 MW | Planned | 45 km |
| Cowboy Solar II | Power plant | 565 MW | Permitted | 45 km |
| Douglas Res water right 0303725 18885.00000 | Water right | — | — | 49 km |
Operator and place
More from Microsoft
- Microsoft Fairwater Atlanta636 MW
- Microsoft Fairwater Wisconsin369 MW
- Microsoft Goodyear202 MW
- Microsoft Project Osmium190 MW
- Microsoft SAT4075 MW
- Nebius Mantsala75 MW
- Microsoft-Nebius New Jersey50 MW
- Microsoft SAT1447 MW
Other data centers in Wyoming
- Meta Cheyenne152 MW
- CYS41 Datacenter
- Data center, Campbell County (OSM way 1414729942)
- Data center, Laramie County (OSM way 1177975782)
- Data center, Laramie County (OSM way 1177975788)
- Data center, Laramie County (OSM way 1197757147)
- Data center, Laramie County (OSM way 1485867694)
- Data center, Laramie County (OSM way 1485867696)
Data on this page
- Colorado DWR REST API. Colorado DWR REST API, CDSS Terms of Use.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Epoch AI. Epoch AI data centers, CC BY 4.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Texas Comptroller qualifying data centers. Texas Comptroller qualifying data centers, Public domain.
- Virginia DEQ issued data center air permits. Virginia DEQ issued data center air permits, Public records.