xAI Colossus is a data center in Shelby County, Tennessee, United States, with a 74,306 m² building, operated by xAI.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Shelby County, Tennessee | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Address | 3231 Paul R Lowery Road, Memphis, TN | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Operator | xAI | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Website | https://x.ai/colossus | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Building footprint | 74,306 m² (building) | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 35.0599, -90.1564 | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.
Request researchHow its operator compares
xAI operates 3 of the 1,336 data centers in the United States in our data with a named owner; 43 owners have more. Counts cover the data centers in our data that name an owner, holder or operator; an asset with several owners counts for each.
| Operator in United States | Rank | Data centers | Share |
|---|---|---|---|
| Amazon Web Services | 1st | 149 | 11% |
| Digital Realty | 2nd | 87 | 6.5% |
| Microsoft | 3rd | 66 | 4.9% |
| Amazon Data Services Inc. | 4th | 60 | 4.5% |
| 5th | 58 | 4.3% | |
| xAI | 44th | 3 | 0.22% |
Nearby
Within 50 km of this data center: 5 power plants (2 operating, 2,194 MW), measured from the coordinates in the facts above. The table shows the nearest 3.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Allen | Power plant | 1,290 MW | Operating | 1.7 km |
| TVA Southaven Combined Cycle | Power plant | 904 MW | Operating | 13 km |
| Penton Solar Plant | Power plant | 190 MW | Planned | 24 km |
Operator and place
More from xAI
- xAI Macrohardrrdata center
- xAI Macrohard Colossus 2data center
- xAI Colossus Memphis Phase 3275,796 H100e
- xAI Colossus Memphis Phase 2200,000 H100e
- xAI Colossus Memphis Phase 1100,000 H100e
Other data centers in Tennessee
Data on this page
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Epoch AI. Epoch AI data centers, CC BY 4.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Texas Comptroller qualifying data centers. Texas Comptroller qualifying data centers, Public domain.
- Virginia DEQ issued data center air permits. Virginia DEQ issued data center air permits, Public records.