CO2 emitter · Eindhoven, North Brabant, Netherlands

Heat pump Eindhoven (Sligro Food Group Nederland)

Heat pump Eindhoven (Sligro Food Group Nederland) is a planned CO2 emitter in Eindhoven, North Brabant, Netherlands, operated by Sligro Food Group Nederland B.V.

We hold more on this asset.Grid operator and location: available on request.

Request this data

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEindhovenRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Grid areaAvailable on requestNetbeheer Nederland capaciteitskaart · Restricted · checked 24 Oct 2026
AddressMeerenakkerweg 14, 5652 AV EindhovenRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
StatusPlanned (SDE subsidy granted, not yet in use)RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
OperatorSligro Food Group Nederland B.V.RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Capacity1.2 MWRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
TechnologyHeat pumpRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Grid operatorAvailable on requestNetbeheer Nederland capaciteitskaart · Restricted · checked 24 Oct 2026
Coordinates51.4299, 5.4349RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026

Know more about this CO2 emitter, or want an introduction to its operator? Ask us.

Nearby

Within 50 km of this CO2 emitter: 754 permit notices, 550 power plants (420 operating, 3,563 MW), 64 substations, 7 data centers and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
150 kV Eindhoven WestSubstation——0.3 km
Industry omgevingsvergunning application, Eindhoven (gmb-2025-566878)Permit notice——0.8 km
Industry omgevingsvergunning decision, Eindhoven (gmb-2026-167677)Permit notice——0.8 km
Solar Eindhoven (Slim Met Energie)Power plant4.76 MWCancelled0.9 km
Solar Veldhoven (Sunrock Assets XXIV)Power plant1.42 MWOperating2.3 km
Solar Eindhoven (HTCE Solar)Power plant3.64 MWOperating2.4 km
NorthC Datacenter EindhovenData center——3.0 km
Industry omgevingsvergunning draft decision, Veldhoven (prb-2025-7824)Permit notice——3.0 km
150 kV Eindhoven ZuidSubstation——3.2 km