CO2 emitter · Drimmelen, North Brabant, Netherlands
Aquathermal heat Terheijden (Eerste Traais Warmtebedrijf)
Aquathermal heat Terheijden (Eerste Traais Warmtebedrijf) is a cancelled CO2 emitter in Drimmelen, North Brabant, Netherlands, operated by Eerste Traais Warmtebedrijf B.V.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Drimmelen | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Status | Cancelled (withdrawn from the list of projects in management before it was realised) | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Operator | Eerste Traais Warmtebedrijf B.V. | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Capacity | 2.6 MW | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Technology | Aquathermal heat | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Coordinates | 51.6445, 4.7480 | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
Research on this CO2 emitter and its operator.Who owns it up to the parent company, its emissions and permits, and an introduction to the operator.
Request researchNearby
Within 50 km of this CO2 emitter: 584 power plants (464 operating, 6,770 MW), 395 permit notices, 110 substations, 16 data centers and 3 processing plants, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Wind Terheijden (Windmolen de Noord) | Power plant | 4.5 MW | Operating | 0.0 km |
| Zonnepark De Bergen | Power plant | 11.3 MW | Cancelled | 2.0 km |
| Solar Wagenberg (Essent Energy Infrastructure Solutions) | Power plant | 1.13 MW | Operating | 2.6 km |
| 150 kV substation (OSM way/1420428473) | Substation | — | — | 3.4 km |
| 150 kV substation (OSM way/1395177263) | Substation | — | — | 3.4 km |
| 150 kV substation (OSM way/1420428478) | Substation | — | — | 3.6 km |
| Substation omgevingsplan application, Breda (gmb-2024-529751) | Permit notice | — | — | 4.4 km |
| Substation omgevingsvergunning decision, Breda (gmb-2025-146099) | Permit notice | — | — | 4.4 km |
| Battery storage omgevingsvergunning application, Breda (gmb-2026-380494) | Permit notice | — | — | 5.2 km |
Operator and place
Other CO2 emitters in North Brabant
- Biomass heat 's-Hertogenbosch (Heineken Netherlands Supply)
- Biomass heat 's-Hertogenbosch (Waterschap Aa en Maas)
- Biomass heat Boxtel (Hydreco)
- Biomass heat Breda (Ennatuurlijk Warmteproductie & Assets)
- Biomass heat Breda (Ennatuurlijk)
- Biomass heat Breda (Eteck)
- Biomass heat Goirle (VP Energie)
- Biomass heat Odiliapeel (Attero)
Data on this page
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.