Permit notice · Veldhoven, North Brabant, Netherlands
Industry omgevingsvergunning draft decision, Veldhoven (prb-2025-7824)
Industry omgevingsvergunning draft decision, Veldhoven (prb-2025-7824) is a permit notice in Veldhoven, North Brabant, Netherlands, published 15 May 2025, applied for by Linde Electronics B.V.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Veldhoven | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Permit date | 15 May 2025 (omgevingsvergunning) | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Notice type | Draft decision | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Applicant | Linde Electronics B.V. | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Technology | Industry | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Coordinates | 51.4084, 5.4086 | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
Research on this permit notice and its holder.Who holds it up to the parent company, the decision and the asset it is for, and an introduction to the holder.
Request researchLatest events
Dated events about this permit notice from official notices and registers, newest first. All recent changes.
- Draft decision (environmental permit) · source
Nearby
Within 50 km of this permit notice: 522 power plants (399 operating, 3,443 MW), 62 substations, 51 CO2 emitters (35 operating), 7 data centers and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Solar Veldhoven (Sunrock Assets XXIV) | Power plant | 1.42 MW | Operating | 0.8 km |
| 150 kV Eindhoven West | Substation | — | — | 2.7 km |
| Heat pump Eindhoven (Sligro Food Group Nederland) | CO2 emitter | — | Planned | 3.0 km |
| Zonnepark Waalre | Power plant | 1.4 MW | Operating | 3.0 km |
| Solar Eindhoven (HTCE Solar) | Power plant | 3.64 MW | Operating | 3.1 km |
| NorthC Datacenter Eindhoven | Data center | — | — | 3.5 km |
| 150 kV Eindhoven Zuid | Substation | — | — | 4.0 km |
| Interconnect Eindhoven | Data center | — | — | 4.0 km |
| 150 kV Eindhoven Noord | Substation | — | — | 6.4 km |
Place
Other permit notices in North Brabant
- Battery storage omgevingsplan application, Bergeijk (gmb-2025-54004)
- Battery storage omgevingsplan application, Reusel-De Mierden (gmb-2026-479275)
- Battery storage omgevingsplan decision, Bergeijk (gmb-2025-256724)
- Battery storage omgevingsplan decision, Gemert-Bakel (gmb-2026-211754)
- Battery storage omgevingsplan decision, Laarbeek (gmb-2025-567631)
- Battery storage omgevingsplan decision, Oisterwijk (gmb-2025-573841)
- Battery storage omgevingsvergunning application, 's-Hertogenbosch (gmb-2026-438078)
- Battery storage omgevingsvergunning application, Altena (gmb-2026-248644)
Data on this page
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.