Substation · Overijssel, Netherlands

110 kV Weideweg

110 kV Weideweg is a substation in Overijssel, Netherlands, operated by TenneT.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationOverijsselOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
OperatorTenneTOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Voltage110 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Coordinates52.2738, 6.7748OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026

Research on this substation and its operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the operator.

Request research

How its operator compares

TenneT operates 427 of the 440 substations in the Netherlands in our data with a named owner; the most of any owner. Counts cover the substations in our data that name an owner, holder or operator; an asset with several owners counts for each.

Operator in NetherlandsRankSubstationsShare
TenneT1st42797%
ProRail2nd61.4%
DSM/Chemelot3rd30.68%
Stedin3rd30.68%
EdgeConnex5th20.45%

Nearby

Within 50 km of this substation: 455 permit notices, 326 power plants (228 operating, 2,866 MW), 20 CO2 emitters (15 operating) and 2 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Biomass Hengelo Ov (Waterschap Vechtstromen)Power plant2 MWOperating0.7 km
Solar Hengelo Ov (IKEA)Power plant1.84 MWOperating1.7 km
Solar Park Hengelo BoeldershoekPower plant15 MWPermitted2.0 km
Battery storage omgevingsvergunning application, Hengelo (O) (gmb-2026-181580)Permit notice——2.1 km
Biomass heat Hengelo Ov (Warmtebedrijf Hengelo)CO2 emitter—Operating2.6 km
Nitrogen natuurvergunning application, Hengelo (O) (prb-2025-21809)Permit notice——3.2 km
Battery storage omgevingsvergunning application, Hengelo (O) (gmb-2026-444392)Permit notice——3.4 km
Equinix EnschedeData center——6.5 km
Biomass heat Zenderen (Twence)CO2 emitter—Operating7.7 km

Operator and place

More from TenneT

Candidate sites around this substation

7 sites of land near 110 kV Weideweg have it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.

Other substations in Overijssel

All 76 substations in Overijssel, Netherlands

Data on this page