Substation · North Brabant, Netherlands
150 kV Tilburg Zuid
150 kV Tilburg Zuid is a substation in North Brabant, Netherlands, operated by TenneT.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | North Brabant | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Operator | TenneT | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Voltage | 150 kV | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Coordinates | 51.5375, 5.0518 | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
Research on this substation and its operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the operator.
Request researchHow its operator compares
TenneT operates 427 of the 440 substations in the Netherlands in our data with a named owner; the most of any owner. Counts cover the substations in our data that name an owner, holder or operator; an asset with several owners counts for each.
| Operator in Netherlands | Rank | Substations | Share |
|---|---|---|---|
| TenneT | 1st | 427 | 97% |
| ProRail | 2nd | 6 | 1.4% |
| DSM/Chemelot | 3rd | 3 | 0.68% |
| Stedin | 3rd | 3 | 0.68% |
| EdgeConnex | 5th | 2 | 0.45% |
Nearby
Within 50 km of this substation: 517 power plants (418 operating, 3,857 MW), 320 permit notices, 58 CO2 emitters (35 operating), 7 data centers and 2 processing plants, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Grid connection omgevingsplan draft decision, Tilburg (gmb-2025-482851) | Permit notice | — | — | 0.1 km |
| Substation omgevingsplan decision, Tilburg (gmb-2026-102943) | Permit notice | — | — | 0.1 km |
| Solar Tilburg (Powerlinq III) | Power plant | 4.23 MW | Operating | 0.6 km |
| Solar Tilburg (The Sting Companies) | Power plant | 2.22 MW | Cancelled | 0.7 km |
| Zonnepark Beeksedijk | Power plant | 15.1 MW | Cancelled | 0.8 km |
| Biomass heat Goirle (VP Energie) | CO2 emitter | — | Operating | 2.5 km |
| Solar park omgevingsvergunning decision, Goirle (gmb-2025-475647) | Permit notice | — | — | 3.5 km |
| Heat pump Tilburg (Vion Tilburg) | CO2 emitter | — | Planned | 4.9 km |
| Heat pump Tilburg (Ad van Geloven) | CO2 emitter | — | Planned | 5.4 km |
Operator and place
More from TenneT
- 220 kV Hollandse Kust Zuid Betasubstation
- 110 kV AVIsubstation
- 110 kV Salincosubstation
- 380 kV Centrale Diemensubstation
- 150 kV Haarlemmermeersubstation
- 150 kV Windpark Krammersubstation
- 150 kV Google Datacenter Middenmeersubstation
- 380 kV Tilburgsubstation
Candidate sites around this substation
7 sites of land near 150 kV Tilburg Zuid have it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.
- 49 ha site at Tilburg Z 24870.0 km · score 56
- 34 ha site at Tilburg Z 5660.13 km · score 56
- 47 ha site at Tilburg Z 31350.41 km · score 55
- 34 ha site at Goirle A 45590.69 km · score 48
- 48 ha site at Tilburg Z 31281.31 km · score 46
- 40 ha site at Tilburg E 22451.11 km · score 36
- 34 ha site at Goirle D 21641.75 km · score 21
Other substations in North Brabant
Data on this page
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.