Substation · Best, North Brabant, Netherlands

Hoogspanningsstation Best (Best substation)

Hoogspanningsstation Best is a 150 kV substation in Best, North Brabant, Netherlands, operated by TenneT.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth BrabantOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
LocationBest (point in boundary)PDOK Bestuurlijke Gebieden (Kadaster) · CC BY 4.0 · checked 25 Oct 2026
OperatorTenneTOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Voltage150 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Coordinates51.4881, 5.4125OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Request research

How its operator compares

TenneT operates 427 of the 440 substations in the Netherlands in our data with a named owner; the most of any owner. Counts cover the substations in our data that name an owner, holder or operator; an asset with several owners counts for each.

Operator in NetherlandsRankSubstationsShare
TenneT1st42797%
ProRail2nd61.4%
DSM/Chemelot3rd30.68%
Stedin3rd30.68%
EdgeConnex5th20.45%

Nearby

Within 50 km of this substation: 802 permit notices, 596 power plants (452 operating, 3,740 MW), 61 CO2 emitters (40 operating), 6 data centers and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Substation omgevingsplan application, Best (gmb-2026-190377)Permit notice——0.0 km
Substation omgevingsplan decision, Best (gmb-2026-282730)Permit notice——0.0 km
Solar Eindhoven (Indi Solutions 1)Power plant1.03 MWCancelled0.8 km
Solar Best (C & W Beheer)Power plant1.75 MWOperating0.9 km
Solar Eindhoven (One Solar Beheer VIII)Power plant4.16 MWPlanned0.9 km
Grid connection omgevingsvergunning decision, Eindhoven (gmb-2025-420016)Permit notice——1.3 km
NorthC Datacenter Eindhoven 2Data center——1.4 km
Biomass heat Son en Breugel (Ecoson)CO2 emitter—Operating3.7 km
Biomass heat Son en Breugel (Rendac Son)CO2 emitter—Operating3.7 km

Operator and place

Data centers nearest to this substation

More from TenneT

Candidate sites around this substation

17 sites of land near 150 kV Best have it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.