Substation · Gelderland, Netherlands

Tractie onderstation Zevenaar-Oost

Tractie onderstation Zevenaar-Oost is a 150 kV substation in Gelderland, Netherlands, operated by ProRail and TenneT.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationGelderlandOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
OperatorProRailOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
OperatorTenneTOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Voltage150 kV (levels 150, 25 kV)OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Coordinates51.9172, 6.0948OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026

Research on this substation and its operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the operator.

Request research

How its operator compares

TenneT operates 427 of the 440 substations in the Netherlands in our data with a named owner; the most of any owner. Counts cover the substations in our data that name an owner, holder or operator; an asset with several owners counts for each.

Operator in NetherlandsRankSubstationsShare
TenneT1st42797%
ProRail2nd61.4%
DSM/Chemelot3rd30.68%
Stedin3rd30.68%
EdgeConnex5th20.45%

Nearby

Within 50 km of this substation: 1,052 permit notices, 440 power plants (315 operating, 2,419 MW), 38 CO2 emitters (25 operating) and 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Biomass Zevenaar (Ennatuurlijk)Power plant1.25 MWOperating1.0 km
Solar Zevenaar (Gazeley Zevenaar)Power plant6.59 MWOperating1.0 km
Solar Zevenaar (Gazeley Zevenaar)Power plant9.67 MWOperating1.3 km
Industry omgevingsvergunning application, Zevenaar (gmb-2025-284850)Permit notice——1.5 km
Industry omgevingsvergunning application, Zevenaar (gmb-2025-310481)Permit notice——1.5 km
Nitrogen natuurvergunning decision, Zevenaar (prb-2025-3747)Permit notice——2.2 km
Heat pump Wehl (B.V. Esbro)CO2 emitter—Operating9.5 km
Green gas Bemmel (Groen Gas Gelderland)CO2 emitter—Operating13 km
Green gas Bemmel (Groen Gas Gelderland)CO2 emitter—Permitted13 km

Operators and place

More from ProRail

Candidate sites around this substation

4 sites of land near Tractie onderstation Zevenaar-Oost have it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.

Other substations in Gelderland

All 81 substations in Gelderland, Netherlands