Substation · Scotland, United Kingdom
Haudagain Primary
Haudagain Primary is a 33 kV primary substation in Scotland, United Kingdom, with 10.3 MVA of demand headroom and 18.9 MW of generation headroom, connected by Scottish Hydro Electric Power Distribution plc.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Scotland | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Scottish Hydro Electric Power Distribution plc | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Demand headroom | 10.3 MVA | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Generation headroom | 18.9 MW | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Transformers | 2 x 10 / 20MVA | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Level | Primary substation | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Fed from | Persley GSP | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Congestion (offtake) | None (green on the heat map) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Congestion (feed-in) | None (green on the heat map) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 33 kV (levels 33, 11 kV) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 57.1723, -2.1435 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.
Request researchNearby
Within 50 km of this substation: 204 power plants (62 operating, 642 MW), 117 grid connections (53 operating, 405 MW) and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Persley BESS - Battery Storage | Power plant | 70.1 MW | Permitted | 1.0 km |
| Persley Croft grid connection | Grid connection | 50.4 MW | Planned | 1.1 km |
| Persley Croft - Battery Storage | Power plant | 49.9 MW | Permitted | 1.2 km |
| Persley Waste Water Treatment Works grid connection | Grid connection | 72.6 MW | Planned | 1.3 km |
| Aberdeen Hydrogen Hub Facility | Power plant | 8 MW | Cancelled | 1.7 km |
| Brightsolid | Data center | — | — | 2.4 km |
| Arjo Wiggins grid connection | Grid connection | 4.75 MW | Operating | 2.6 km |
Grid operator and place
More from Scottish Hydro Electric Power Distribution plc
- Abernethy GSPsubstation
- Abernethy Primarysubstation
- Balbeggie Primarysubstation
- Bridge of Earn Primarysubstation
- Errol Primarysubstation
- Glendevon Primarysubstation
- Milnathort Primarysubstation
- Harbour Primarysubstation
Other substations in Scotland
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.