Substation · Scotland, United Kingdom
Buckie Primary
Buckie Primary is a 33 kV primary substation in Scotland, United Kingdom, with 0 MVA of demand headroom and 0 MW of generation headroom, connected by Scottish Hydro Electric Power Distribution plc.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Scotland | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Scottish Hydro Electric Power Distribution plc | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Demand headroom | 0 MVA | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Generation headroom | 0 MW | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Transformers | 2 x 12 / 24MVA | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Level | Primary substation | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Fed from | Keith 1 GSP | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Congestion (offtake) | Full (red on the heat map, limited by upstream thermal capacity & upstream voltage constraint) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Congestion (feed-in) | Full (red on the heat map, limited by upstream thermal capacity) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 33 kV (levels 33, 11 kV) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 57.6695, -2.9523 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.
Request researchNearby
Within 50 km of this substation: 149 power plants (53 operating, 3,163 MW) and 84 grid connections (42 operating, 461 MW), measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Boormalt 2.3MW PV grid connection | Grid connection | 2.3 MW | Planned | 1.1 km |
| The Portgordon Maltings, Phase 2 - Aerobic Digestion Facility | Power plant | 4 MW | Permitted | 4.4 km |
| The Portgordon Maltings. Phase 1 - Aerobic Digestion Facility | Power plant | 4 MW | Permitted | 4.5 km |
| The Portgordon Maltings, Phase 3 - Aerobic Digestion Facility | Power plant | 4 MW | Permitted | 4.6 km |
| Netherton of Windyhills grid connection | Grid connection | 4.37 MW | Operating | 9.4 km |
| Auchinderran Wind Farm grid connection | Grid connection | 31 MW | Planned | 10 km |
Grid operator and place
Grid connections attached to this substation
More from Scottish Hydro Electric Power Distribution plc
- Abernethy GSPsubstation
- Abernethy Primarysubstation
- Balbeggie Primarysubstation
- Bridge of Earn Primarysubstation
- Errol Primarysubstation
- Glendevon Primarysubstation
- Milnathort Primarysubstation
- Harbour Primarysubstation
Other substations in Scotland
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.