Substation · Scotland, United Kingdom

Aviemore Primary

Aviemore Primary is a substation in Scotland, United Kingdom, connected by Scottish Hydro Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationScotlandSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Demand headroom1.26 MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Generation headroom0 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Transformers2 x 12 / 24MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LevelPrimarySSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Fed fromBoat of Garten GSPSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (offtake)Limited (amber on the heat map, limited by substation thermal capacity)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (feed-in)Full (red on the heat map, limited by upstream thermal capacity)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kV (levels 33, 11 kV)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates57.1801, -3.8237SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this substation, or want an introduction to its grid operator? Ask us.

Nearby

Within 50 km of this substation: 83 power plants (28 operating, 1,528 MW) and 24 grid connections (13 operating, 310 MW), measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Boat of Garten BESS grid connectionGrid connection49.9 MWOperating10 km
Boat of Garten - Battery Energy StoragePower plant49.9 MWCancelled10 km
Allt Duine Wind FarmPower plant93 MWCancelled12 km
Balnespick Wind FarmPower plant55.8 MWPlanned19 km
TOM NAN Clach Farm Wind grid connectionGrid connection37.1 MWOperating30 km
Cairn Duhie Wind Farm grid connectionGrid connection104 MWPlanned35 km

Grid operator and place

More from Scottish Hydro Electric Power Distribution plc

Other substations in Scotland

All 453 substations in Scotland, United Kingdom