Substation · England, United Kingdom

Prospect Road

Prospect Road is a substation in England, United Kingdom, connected by Northern Powergrid (Yorkshire) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Demand headroom11.4 MVANorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Generation headroom2.21 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Firm capacity23 MVANorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
LevelPrimaryNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Fed fromEllandNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Fed fromLindleyNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Congestion (offtake)None (green on the heat map)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Congestion (feed-in)None (green on the heat map)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage11 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.6477, -1.8398Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this substation, or want an introduction to its grid operator? Ask us.

Nearby

Within 50 km of this substation: 528 grid connections (282 operating, 2,663 MW), 388 power plants (109 operating, 1,346 MW), 21 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Solar 2.1 MW grid connection at Dowker StreetGrid connection2.1 MWPlanned2.4 km
Gas 19.95 MW grid connection at Zeneca 1_2Grid connection20 MWOperating3.9 km
Gas 3.2 MW grid connection at Prospect RoadGrid connection3.2 MWOperating4.4 km
Vine Street EfWPower plant9.5 MWOperating4.4 km
Lowfields Energy Storage ProjectPower plant49.9 MWPermitted5.2 km
Redcentric Elland Data CentreData center——5.3 km
Stainland RoadPower plant20 MWCancelled5.5 km
Data center, England (OSM way 403124345)Data center——7.3 km
Lloyds Banking Group CopleyData center——7.4 km

Grid operator and place

Grid connections attached to this substation

More from Northern Powergrid (Yorkshire) plc

Other substations in England

All 1215 substations in England, United Kingdom