Substation · England, United Kingdom

Harden

Harden is an 11 kV primary substation in England, United Kingdom, with 4.07 MVA of demand headroom and 4.27 MW of generation headroom, connected by Northern Powergrid (Yorkshire) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Demand headroom4.07 MVANorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Generation headroom4.27 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Firm capacity8 MVANorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
LevelPrimary substationNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Fed fromBradford WestNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Fed fromBingley 132/33kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Congestion (offtake)Limited (amber on the heat map)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Congestion (feed-in)Limited (amber on the heat map)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage11 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.8340, -1.8677Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.

Request research

Nearby

Within 50 km of this substation: 398 grid connections (212 operating, 2,007 MW), 298 power plants (85 operating, 938 MW), 15 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Lane at Harop Lane grid connectionGrid connection87 MWOperating1.1 km
Lane Side - Energy StoragePower plant100 MWPermitted1.8 km
Battery storage 99.8 MW grid connection at Lane Side BESS DirectGrid connection99.8 MWPlanned1.9 km
Battery storage 200 MW grid connection at Bradford West A BESS DirectGrid connection200 MWPlanned2.1 km
Bradford West, Harrop Lane, Wilsden - Battery StoragePower plant100 MWPermitted2.6 km
Bradford West Substation (Harrop Edge Farm)Power plant49.9 MWUnder construction2.7 km
Data center, England (OSM way 403124345)Data center——14 km
Lloyds Banking Group CopleyData center——14 km
Redcentric Elland Data CentreData center——16 km

Grid operator and place

More from Northern Powergrid (Yorkshire) plc

Candidate sites around this substation

4 sites of land near Harden have it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.

Other substations in England

All 1666 substations in England, United Kingdom

Data on this page