Substation · England, United Kingdom
Claywheels Lane
Claywheels Lane is a substation in England, United Kingdom, connected by Northern Powergrid (Yorkshire) plc.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Grid operator | Northern Powergrid (Yorkshire) plc | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Demand headroom | 4.21 MVA | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Generation headroom | 28.6 MW | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Firm capacity | 24 MVA | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Level | Primary | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Fed from | Neepsend | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Congestion (offtake) | Limited (amber on the heat map) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Congestion (feed-in) | Limited (amber on the heat map) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Voltage | 11 kV | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Coordinates | 53.4175, -1.5029 | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
Know more about this substation, or want an introduction to its grid operator? Ask us.
Nearby
Within 50 km of this substation: 536 grid connections (212 operating, 1,885 MW), 472 power plants (146 operating, 4,163 MW), 17 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Gas and Solar 2.05 MW grid connection at Claywheels Lane | Grid connection | 2.05 MW | Operating | 0.2 km |
| Battery storage 45 MW grid connection at Neepsend Energy Park | Grid connection | 45 MW | Planned | 1.6 km |
| Parkwood Landfill Scheme | Power plant | 1.2 MW | Operating | 2.3 km |
| Waste 5 MW grid connection at Penistone Road | Grid connection | 5 MW | Operating | 2.3 km |
| UoS IT Services | Data center | — | — | 4.2 km |
| Petre Street | Power plant | 20 MW | Cancelled | 4.4 km |
| Loicher Lane | Power plant | 8 MW | Operating | 4.7 km |
| Hive IT | Data center | — | — | 4.9 km |
| HSBC Data Centre | Data center | — | — | 8.0 km |
Grid operator and place
Grid connections attached to this substation
More from Northern Powergrid (Yorkshire) plc
- Attercliffesubstation
- Barugh 132/66kVsubstation
- Beeston Royds 132/33kVsubstation
- Beverley 132/33kVsubstation
- Bingley 132/33kVsubstation
- Blackburn Meadows Bsubstation
- Blytonsubstation
- Bradfordsubstation
Other substations in England
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.