Bungay Primary 11kV Substation

Bungay Primary 11kV Substation is an 11 kV primary substation in England, United Kingdom, with 6.3 MVA of demand headroom and 11 MVA of generation headroom, operated by Eastern Power Networks plc (UK Power Networks, East England licence area).

Map: where Bungay Primary 11kV lies
52.4530, 1.4372 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Demand headroom6.3 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Generation headroom11 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Firm capacity23 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
LevelPrimary substationUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.4530, 1.4372UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Nearby

Within 50 km of this substation: 209 power plants (65 operating, 2,254 MW), 141 grid connections (87 operating, 1,629 MW) and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
(ANM) South East Of Flixton grid connectionGrid connection27 MWPlanned4.2 km
Laurels FarmPower plant2 MWCancelled4.9 km
Laurels Farm grid connectionGrid connection2 MWPlanned5.3 km
(ANM) Redisham Hall Farm grid connectionGrid connection29.6 MWPlanned6.6 km
Redisham Hall Farm, School Road - Solar PanelsPower plant42 MWPlanned6.8 km
Stockton Wind TurbinePower plant1.5 MWCancelled6.9 km
Norwich to TilburyTransmission line—Planned17 km
LionLink InterconnectorTransmission line—Planned29 km