Barrack St Primary 11kV Substation
Barrack St Primary 11kV Substation is an 11 kV primary substation in England, United Kingdom, with 11.4 MVA of demand headroom and 20.1 MVA of generation headroom, operated by Eastern Power Networks plc (UK Power Networks, East England licence area).
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | Eastern Power Networks plc (UK Power Networks, East England licence area) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Demand headroom | 11.4 MVA | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Generation headroom | 20.1 MVA | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Firm capacity | 24 MVA | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Level | Primary substation | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 11 kV | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 52.6363, 1.3040 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.
Nearby
Within 50 km of this substation: 205 power plants (71 operating, 1,157 MW), 142 grid connections (94 operating, 1,647 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Heigham Water Treatment Works grid connection | Grid connection | 1 MW | Operating | 2.1 km |
| Battery storage 150 MW grid connection at Norwich | Grid connection | 150 MW | Planned | 2.5 km |
| Briar Solar Farm | Power plant | 1.9 MW | Operating | 3.0 km |
| Crown Point grid connection | Grid connection | 228 MW | Planned | 3.3 km |
| Land East of White Horse Lane | Power plant | 5 MW | Operating | 3.4 km |
| White Horse Lane (Trowse) - Phase 2 | Power plant | 9 MW | Cancelled | 3.4 km |
| Norwich to Tilbury | Transmission line | — | Planned | 7.3 km |
Grid operator and place
More from Eastern Power Networks plc
- Canvey Primary 11kVsubstation
- Thorley Primary 11kVsubstation
- Peterborough South Grid 11kVsubstation
- Westbury Primary 11kVsubstation
- Laxfield Primary 11kVsubstation
- Fulbourn Grid 33kVsubstation
- Earlham Grid 33kVsubstation
- Hunstanton Primary 11kVsubstation
Candidate sites around this substation
5 sites of land near Barrack St Primary 11kV have it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.
- 2.83 ha brownfield site at Barrack Street Development Site, Norwich0.07 km · score 40
- 1.09 ha brownfield site at Land east of Bishop Bridge Road (incl 29-31 Bishop Bridge Road)…, Norwich0.56 km · score 33
- 4.35 ha brownfield site at Anglia Square, Norwich0.64 km · score 32
- 1.1 ha brownfield site at St. Mary's Works, Duke Street, Norwich NR3 3AF0.89 km · score 28
- 1.01 ha brownfield site at Site north of Raynham Street, Norwich1.67 km · score 16
Other substations in England
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- UK Power Networks. UK Power Networks open data portal, CC BY 4.0.