Substation · Schleswig-Holstein, Germany

NordLink HVDC Wilster

NordLink HVDC Wilster is a 525 kV substation in Schleswig-Holstein, Germany, connected by TenneT TSO GmbH.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSchleswig-HolsteinOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Grid operatorTenneT TSO GmbHOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Voltage525 kV (levels 525, 380 kV)OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Coordinates53.9192, 9.3443OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026

Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.

Request research

Nearby

Within 50 km of this substation: 271 power plants (220 operating, 4,680 MW), 3 CO2 emitters (1,845,794 tCO2e) and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Windpark Nortorf 2Power plant13.2 MWOperating2.5 km
Windpark KamprittPower plant16.7 MWPlanned3.2 km
Windpark Nortorf WestPower plant12.7 MWOperating3.2 km
Produktionskomplex (Ziegler, TAM, NFA) BrunsbüttelCO2 emitter185,999 tCO2e—12 km
Werk LägerdorfCO2 emitter816,206 tCO2e—16 km
Heizkraftwerk WedelCO2 emitter843,589 tCO2e—46 km
Rechenzentrum AkquinetData center——49 km

Grid operator and place

More from TenneT TSO GmbH

Other substations in Schleswig-Holstein

All 273 substations in Schleswig-Holstein, Germany

Data on this page