Substation · Leipzig, Saxony, Germany

Umspannwerk Plaußig (Plaußig substation)

Umspannwerk Plaußig is a 110 kV substation in Leipzig, Saxony, Germany, connected by Mitteldeutsche Netzgesellschaft Strom mbH.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationLeipzig (point in boundary)BKG Verwaltungsgebiete 1:250 000 (VG250) · DL-DE-BY-2.0 · checked 25 Oct 2026
LocationSaxonyOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Grid operatorMitteldeutsche Netzgesellschaft Strom mbHOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Voltage110 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Coordinates51.4068, 12.4292OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Request research

Nearby

Within 50 km of this substation: 142 power plants (110 operating, 4,311 MW), 10 CO2 emitters (6,704,562 tCO2e), 2 data centers and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
WP LeipzigPower plant34.1 MWOperating1.4 km
122-1-Rackwitz 5.1Power plant14.1 MWOperating4.9 km
BESS RackwitzPower plant60 MWPlanned5.8 km
GuD und Heizkraftwerk NordCO2 emitter183,839 tCO2e—7.2 km
UniversitätsrechenzentrumData center——8.3 km
Neubau KI-RechenzentrumData center—Under construction10 km
HKW Leipzig SüdCO2 emitter188,697 tCO2e—13 km
R-ZeitungsdruckpapierfabrikCO2 emitter187,336 tCO2e—13 km
European Lithium Refining and Recycling Hub Bitterfeld: from primary raw materials via recycling to critical solid state battery componentsProcessing plant——30 km

Grid operator and place

More from Mitteldeutsche Netzgesellschaft Strom mbH

Other substations in Saxony

All 246 substations in Saxony, Germany

Data on this page