Substation · Saxony, Germany
Umspannwerk Dresden Süd
Umspannwerk Dresden Süd is a 380 kV substation in Saxony, Germany, connected by 50Hertz Transmission GmbH.
We hold more on this asset.Grid operator, location, planned reinforcement and voltage: available on request.
Request this dataFacts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Saxony | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Grid operator | 50Hertz Transmission GmbH | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Planned reinforcement | Available on request | Netzentwicklungsplan Strom: point measures (Punktmaßnahmen) · Restricted · checked 24 Oct 2026 |
| Voltage | 380 kV | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Coordinates | 50.9895, 13.8423 | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
Know more about this substation, or want an introduction to its grid operator? Ask us.
Also recorded as
2 sources record Umspannwerk Dresden Süd; this page joins their facts, each with its own source. Links to any of the records lead here. How records are matched.
| Name in the source | Identifier | Source | Matched on |
|---|---|---|---|
| Umspannwerk Dresden Süd | asset:osm:way-942771541 | OpenStreetMap power infrastructure (Overpass) | — |
| Dresden/Süd substation | asset:nep:dresden-sud | Netzentwicklungsplan Strom: point measures (Punktmaßnahmen) | Same name and Land |
Nearby
Within 50 km of this substation: 49 power plants (30 operating, 677 MW), 3 CO2 emitters (1,165,035 tCO2e), 1 mine and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| BES DD | Power plant | 12 MW | Operating | 0.2 km |
| Solarpark Pirna | Power plant | 14.5 MW | Operating | 6.0 km |
| Windpark Hausdorf Repowering GmbH & Co. KG | Power plant | 14.6 MW | Planned | 11 km |
| HKW NB Dresden | CO2 emitter | 575,586 tCO2e | — | 11 km |
| Zinnwald Lithium Project | Mine | — | — | 29 km |
| AGC Flat Glass Czech - závod Řetenice | CO2 emitter | 172,660 tCO2e | — | 39 km |
| ČEZ - Teplárna Trmice | CO2 emitter | 416,789 tCO2e | — | 40 km |
| NTT Data Business Solutions Global Managed Services | Data center | — | — | 42 km |
Grid operator and place
More from 50Hertz Transmission GmbH
- Umspannwerk Altdöbernsubstation
- Umspannwerk Altenfeldsubstation
- Umspannwerk Altentreptow Südsubstation
- Beetzsee/Nord substationsubstation
- Brunsbüttel substationsubstation
- Umspannwerk Eisenachsubstation
- Umspannwerk Eulasubstation
- Umspannwerk Freiberg Nordsubstation
Other substations in Saxony
- 110 kV substation (OSM relation/12228400)
- 110 kV substation (OSM relation/4064312)
- 110 kV substation (OSM way/111498102)
- 110 kV substation (OSM way/1145057084)
- 110 kV substation (OSM way/120294826)
- 110 kV substation (OSM way/1230284819)
- 110 kV substation (OSM way/1230854918)
- 110 kV substation (OSM way/127547549)
Data on this page
- © European Union, European Commission (DG GROW). EU CRMA strategic projects, CC BY 4.0.
- European Commission, Union Registry. EU Union Registry public data, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Netzentwicklungsplan Strom: point measures (Punktmaßnahmen). Netzentwicklungsplan Strom: point measures (Punktmaßnahmen), Restricted.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.